The joint venture of Acciona (25%), Sacyr (25%), Altuna y Uria (25%) and Bycam (25%) secured the EUR 88.1 million contract for the construction of the 2.8 km Aperribai-Galdakao section of the Metro Line 5 in Bilbao. The contract includes Bengoetxe and Galdakao stations and the Olabarrieta and Abusu ventilation and emergency shafts. Contact ETS - Euskal Trenbide Sarea, Bilbao, tel +34 946572600, email kontratazioa@ets-rfv.eus. Visit https://www.acciona.com. Ref.n. P20023532. 26/23..