Open call for bids, deadline 20th October, 2003 for design of the Etxebarri-Otxarkoaga-Txurdinaga-Old Town connection on the Bilbao-Durango rail line. Length is 5,209 m, fully underground except 570 m in open cut for a single double-track tunnel. Also three mined stations in Etxebarri, Otxarkaoga and Zurbarambarri. Tender value : €1.3 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=151626-2003, OJ S 165, or contact Basque government, Vitoria-Gasteiz, fax +34 945019786. E-mail imebisa@imebisa.es and m-castejon@ej-gv.net 39/03.Idom received a EUR180,000 contract for E&M equipment design for the third metro line of the Bilbao metro. The 5,750 line, of which 4,352 m in mined twin-track tunnel, 223 m in cut and cover and 487 m in open cut, includes four mined stations (Otxarkoaga, Txurdinaga, Zurbarranbarri, Uribarri) and two open cut stations (San Antonio de Etxebarri and Casco Viejo). Read E-News Weekly 37/2007 & 11/2005. Visit www.idom.es 45/07.Periodic notice, deadline unspecified, being a call for bids aiming at reducing time limits for the receipt of tenders, for construction of 2,700 metres of the Etxebarri-Txurdinaga section of Line 3 of the Bilbao subway and two stations in cavern (Txurdinaga and Otxakoaga). Read E-News Weekly 37/2007. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=35192-2008, OJ S 26, or contact ETS-RFV, Bilbao, fax +34 946572601. E-mail ets@ets-rfv.es 07/08.