Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Spain

Spain, Valencia - es/105

Tramway

Typsa has been appointed designer of the first phase of Line T2 for €2.9 million, section Xí tiva-Line T4. Line T2 will connect Torrefiel and Orriols, north of Valencia, to the Museum of Sciences and Nazaret in the south, entering a north-south tunnel at Pont de Fusta. Underground stops in the city centre at Torres de Serranos, Plaza Míºsico Lí³pez Chí¡varri and Mercado Central. This stretch will be TBM-driven. Then, the line will carry on until the City Hall in cut-and-cover before reaching Xí tiva. Visit www.typsa.es 33/03.Open call for bids, deadline 23rd September, 2003 for design engineering for 4.3 km-long second phase of Line T2, section Xí tiva-Nazaret. The line will intersect the future central station in Germaní­as and Lines 3/5 in Bailén. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=134832-2003, OJ S 148, or contact Generalitat Valenciana, Valencia, fax +34 963866404. More details in E-News Weekly 19/2003. 33/03.Gestec has secured a EUR1.8 million contract for design engineering for the 4.3 km second phase of Line T2, section Xativa-Nazaret. This section runs underground and at grade and will intersect the future central station in Germanias and Lines 3/5 in Bailen. 19/04.Open call for bids, deadline 6th April, 2006 for construction of section Alicante Street-Ruzafa on tram line T2 South. This section includes a 1.1 km-long 5 m-wide cut-and-cover tunnel, carrying two tracks stacked one over one and built at a depth of -17 metres. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=241783-2005, OJ S 245, or contact with Gestor de la Red de Transporte y de Puertos de la Generalitat (GTP), Valencia, fax +34 963976465 or 963976710. E-mail caraval_jua@gva.es 10/06.Open call for bids, deadline 17th March, 2006 for construction management of section Alicante Street-Ruzafa on tram line T2 South. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=024570-2006, OJ S 22, or contact Gestor de la Red de Transporte y de Puertos de la Generalitat (GTP), Valencia, fax +34 963976710. E-mail caraval_jua@gva.es 10/06.Open call for bids, deadline 10th April, 2006 for construction of section Ruzafa-Hermanos Maristas Avenue on tram line T2 South. This section includes a 1.1 km-long 9 m-wide cut-and-cover tunnel, carrying two parallel tracks and built at a depth of -10 metres. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=04044-2006, OJ S 3, or contact Gestor de la Red de Transporte y de Puertos de la Generalitat (GTP), Valencia, fax +34 963976465 or 963976710. E-mail caraval_jua@gva.es 10/06.Open call for bids, deadline 17th March, 2006 for construction management of section Ruzafa-Hermanos Maristas Avenue on tram line T2 South. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=024567-2006, OJ S 22, or contact Gestor de la Red de Transporte y de Puertos de la Generalitat (GTP), Valencia, fax +34 963976710. E-mail caraval_jua@gva.es 10/06.Tram line T2 South is 5,117 metres in length, whereof 2,222 metres below ground, three underground stations and six stops at grade. Read E-News Weekly 12/2005. 10/06.Ferrovial Agromí¡n and Rover Alcisa bagged a EUR36.6 million contract to build section Alicante Street-Ruzafa on tram line T2 South. This section includes a 1.1 km-long 5 m-wide cut-and-cover tunnel, carrying two tracks stacked one over one and built at a depth of -17 metres. Visit www.ferrovial.es and www.roveralcisa.com 22/06.Acciona Infraestructuras and Torrescamara pocketed a EUR24.2 million contract to build section Ruzafa-Hermanos Maristas Avenue on tram line T2 South. This section includes a 1.1 km-long 9 m-wide cut-and-cover tunnel, carrying two parallel tracks and built at a depth of -10 metres. Visit www.acciona-infraestructuras.es 22/06.Initec Infraestructuras and Comaypa have signed a EUR1 million deal for construction management of section Ruzafa-Hermanos Maristas Avenue on tram line T2 South. Read E-News Weekly 12/2005. Visit www.initec.es 42/06.Agrupacion Mediterranea de Ingenieria and Prointec have concluded a EUR1.2 million contract for construction management of section Alicante Street-Ruzafa on tram line T2 South. Read E-News Weekly 12/2005. Visit www.aminsa.com and www.prointec.es 42/06.



Permalink