Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Norway

Norway, Oslo - no/181

Loren line

Closing Date: 03.12.2012 (Tender Closed)

Negotiated procedure, deadline 03.12.2012, for Loren Track-U1-Substructure contract including, amongst other things, driving and securing a rock tunnel with a station hall for Loren station (470 m-long two track tunnel, 2 x 450 m-long one track tunnel), access tunnel and two shafts to the underground station; 200 m-long concrete tunnel; water and frost protection; and the substructure on half of the stretch of the rock tunnel. The substructure is included in the concrete tunnel and trough in this contract. The estimated construction period for this contract is 2.5 years. Contact Kollektivtransportproduksjon AS, att.n Ole Kvale, Oslo, tel +47 22084000, e-mail ole.kvale@ktpas.no. To register interest in this notice and obtain any additional information visit http://www.doffin.no/Search/Search_Switch.aspx?ID=270658. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=339322-2012. 44/12.



Permalink