The Joint Venture Salini Impregilo (51%, leader) and Impresa Pizzarotti & C (49%) won the EUR 388 million contract from Bane NOR to upgrade a 13.6-km section of a rail line between the towns of Nykirke and Barkaker south of Oslo. The contract set to be completed by 2022. The JV is to design and build a double-track line, including two bridges, three tunnels and a station near the town of Skoppum. Contact Bane NOR SF, attn Alexander Grinvoll Brorson, Hamar, email Alexander.Grinvoll.Brorson@banenor.no.
Visit https://www.salini-impregilo.com/en/ and https://www.pizzarotti.it/.
Ref.n. 201800181. 41/19.