Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Norway

Norway, Akershus - no/105

Dovrebanen

Closing Date: 07.09.2010 (Tender Closed)

Open invitation to tender, deadline 07.09.2010, for preparation of tender documents, construction drawings and follow-up as part of engineering design FP1 for 6 km-long Langset-Broehaug section including 0.6 km-long Molalykkja rail tunnel and 0.6 km-long Korlslund road tunnel and southern portal for Ulvin tunnel on Dovre railway. Tender documents will be distributed through a web hotel for which user name and password can be obtained from monica.clemert@jbv.no. Further information, specs and docs can be obtained from Monica Clemert at Dovrebanen Eidsvoll-Hamar in Oslo, tel +47 91655004, time limit 24.08.2010. Contract starts 01.10.2010 for completion 31.12.2017, value range EUR3.71-7.42 million excluding VAT. Tenders or requests to participate must be sent to Jarle Kristian Tangen at Statens vegvesen in Minnesund, tel +47 81522000, e-mail jarle.tangen@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=194796-2010. 27/10. Closing Date: 24.08.2010Open invitation to tender, deadline 24.08.2010, for preparation of tender documents, construction drawings and follow-up as part of engineering design FP2 for 6 km-long Broehaug-Strandlykkja section including 4 km-long Ulvin tunnel and 150 m-long Morstua tunnel on Dovre railway and 2.3 km-long Morskog E6 road tunnel. Contract starts 15.09.2010 for completion 31.12.2017, value range EUR3.71-7.42 million excluding VAT. Contract docs from sources outlined above, time limit 24.08.2010. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=194797-2010. 27/10.Closing Date: 31.08.2010Open invitation to tender, deadline 31.08.2010, for preparation of tender documents, construction drawings and follow-up as part of engineering design FP3 for Strandlykkja-Kleverud/Labbdalen with 10 km of E6 road including 700 m-long Espa tunnel, and 5 km of Dovre railway. Contract starts 22.09.2010 for completion 31.12.2017, value range EUR3.71-7.42 million excluding VAT. Contract docs from sources outlined above, time limit 17.08.2010. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=194799-2010. 27/10.



Permalink