Postponed from 21.06.2018 to 03.07.2018 the deadline of the
open invitation to tender for the design and management of the environmental
monitoring plan (PMA) for the construction of the works of the future
Turin-Lyon rail link, Italian side. The value of the contract is EUR920.000,
excluding VAT, duration of the contract is for 156 months. Contact TELT sas, Le
Bourget du Lac, email fonction.contrats@telt-sas.com.
Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=262724-2018.
Ref.n. S34. 22/18.