Fifteen core drills to cost €121,000 are to commence in Santa Margherita Ligure on the alignment of a 2,430 m-long 4.8 m-diameter flood relief tunnel to channel the San Siro stream. €450,000 detailed design in late 2003 or early 2004 for work start in 2005 and commissioning in 2007. Full cost €17 million. 01/03.