Two 800m x 8m-diameter tunnels to be driven by EPB and one 300m by conventional methods for Italferr. December 1998.
$40 million. Joint venture of Alpine Bau, Coopsette and CCC to construct 1.9 km x 38.5 m2 segmentally-lined tunnel between Roma Trastevere and Roma St Peter stations on Viterbo line using EPB. Single bore of 7 m i.d. Quattro Venti underground station at halfway position included in the contract. August 1999.