The JV ICG 2 SpA - Inpes Prefabbricati S.p.A (Rome) secured the EUR15 million contract for the completion works on bypass road SS 340 Regina from Porlezza (km 46.200) to the border with Switzerland (52.300 km) for a total length of about 3.7 km, including lining a 3.311 m tunnel. Scheduled completion 22.02.2011. Visit www.inpes.it. 50/09.