The JV S.A.C. Costruzioni Consorzio Stabile from Torrecuso (leader) and Alfieri Impianti & C. Sas from Torchiara secured the EUR5.56 million contract, excluding VAT, for the upgrading of the tunnels Gabbia (1160 m), Prodonno (796 m), Monreale (957 m), Boccardo (1064 m), Giovi (1776 m), Campora 383 m), Bolzaneto I (102 m), Brasile (746 m), Monte Galletto (614 m) and San Bartolomeo (567 m) on the Genoa-Serravalle highway A7 (Phase 2, Lot4A). Contact Autostrade per l'Italia SpA, attn Eng. Maurizio Mazzola, Rome, tel +39 0109916206, email maurizio.mazzola@autostrade.it. For bid documents click here. 36/19.