Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Italy

Italy, Sicily - it/125

Road

Public works concession, deadline 16th November, 2007 for design, construction and operation of a road link from the connection of road SS 514 Chiaramente with road SS 115 to the connection of road SS 194 Ragusana with road SS 114. The south carriageway Ragusa-Catania includes 13 bored tunnels for a total length of 5,983 metres, the longest of which is 1,045 metres in length, and four cut-and-cover tunnels totalling 1,822 metres, the longest of which spans 669 metres. The north carriageway Catania-Ragusa includes also 13 bored tunnels for a total length of 6,247 metres, the longest of which is 1,012 metres in length, and five cut-and-cover tunnels totalling 1,361 metres, the longest of which spans 488 metres. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=154180-2007, OJ S 126, or contact ANAS, Rome, fax +39 0644464413. E-mail dir.projectfinancing@stradeanas.it 30/07.ANAS, the Italian road administration, has declared in the public interest on 23rd April, 2008 a proposal submitted by Silec, Egis Projects, Maltauro Consorzio Stabile and Tecnis for the design, construction and operation of a toll road link from the connection of road SS 514 Chiaramonte with road SS 115 to the connection of road SS 194 Ragusana with road SS 114. The next stage is the approval of the project by the CIPE (interministerial committee for economic planning) and then tenders will be invited to choose a concessionaire but the group of companies will have a preemption right. The south carriageway Ragusa-Catania includes 13 bored tunnels for a total length of 5,983 metres, the longest of which is 1,045 metres in length, and four cut-and-cover tunnels totalling 1,822 metres. The north carriageway Catania-Ragusa includes also 13 bored tunnels for a total length of 6,247 metres, the longest of which is 1,012 metres in length, and five cut-and-cover tunnels totalling 1,361 metres. Visit www.silec.it, www.egis-projects.com, www.gruppomaltauro.it and www.tecnis.it 18/08.



Permalink