Accelerated restricted procedure, deadline 2nd May, 2006 for design and construction of the first section of the Valtrompia highway, which will connect highway A4 with the Trompia valley in Brescia province, segment Ospitaletto-Sarezzo, section Concesio-Sarezzo. The contract also includes work management, safety coordination, land acquisition and environmental monitoring.Section Ospitaletto-Concesio includes the Gussago single-tube tunnel (3,219 m). There is no second tube. While the Ospitaletto to Concesio roadway will run through that tunnel, the opposite direction (Concesio-Ospitaletto) will consist in widening the existing provincial road SP 19, which is almost entirely a section running at grade, with the exception of two short tunnels of less than 500 metres (455 m Mirabella tunnel and 415 m Stella tunnel) which will remain as they are, except for the roadbed which will be refurbished. The pedestrian and vehicular cross passages of the future tunnel will be connected to the existing road at grade.Section Concesio-Lumezzane includes the Villa Carcina twin-tube tunnel (3,652 m), the Monte Palosso single-tube tunnel and parallel emergency bore (1,628 m), the Dosso Ghifone single-tube tunnel and parallel emergency bore (1,810 m) and the Lumezzane single-tube tunnel (1,306 m). See tunnel details here. The highway will be operated by Autostrada Brescia-Padova. Read E-News Weekly 9/2003. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=066572-2006, OJ S 64, or contact ANAS, Rome, fax +39 064454956. 17/06.Restricted call for tenders, deadline 8th January, 2008 for construction of the first section of the Valtrompia highway, which will connect highway A4 with the Trompia valley in Brescia province, segment Ospitaletto-Sarezzo, section Concesio-Sarezzo. Click it/117 for details. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=271878-2007, OJ S 223, or contact ANAS, Rome, fax +39 064456224 or 0644462009. E-mail s.pisani@stradeanas.it 49/07.