Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Italy

Italy, Sicily - it/107

Road

Accelerated restricted procedure, deadline 29th July, 2004 for final design and environment impact study for the Agrigento-Caltanisseta link on SS 640 in Porto Empedocle, section from km 44 to A19 interchange. Includes two twin-tube tunnels, one bored and the second to be built between diaphragm walls, for a total length of 2 x 2 km. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=105079-2004, OJ S 124, or contact ANAS, Rome, fax +39 064454956. 29/04.The eight bidders for widening to four lanes road SS 640 in Porto Empedocle, a project worth EUR448 million and including a 4 km tunnel, two tunnels comprised between 600 and 700 m, two shorter tunnels and a few cut-and-cover tunnels, are Impregilo; Pizzarotti; Condotte; a joint venture of CMC and CCC; a joint venture of Todini and Maltauro; consortium Operae (Baldassini Tognozzi-Pontello and other Tuscan contractors); consortium SIS (Sacyr, INC and Sipal); and a team of consortium Uniter (formed by contractors based in Catania and Parma provinces: Tecnis, Bosco Aldo, Cogip, Ing. Pavesi, Silmar, Sipa, Sigenco and Foglia) and Ergon Engineering and Contracting (CO.ES.TRA., Inso and the Etruria consortium). The final design and environmental study was commissioned to a JV of Technital, Delta Ingegneria, Infratec, Progin and SIS. Click it/107. Read E-News Weekly 8/2006. Visit www.technital.it, www.deltaingegneria.it, www.infratecsrl.it and www.progin.it 39/07.



Permalink