JV ILF Consulting Engineers Austria GmbH (mandataria) — ARGE
Umwelt-Hygiene Ges.m.b.H. — Geoconsulting int. — Geo.zt GmbH–Poscher Beratende
Geologen — EUT GmbH / Srl at Rum/Innsbruck secured the EUR9.26 million
contract, excluding VAT, for the monitoring of water resources during the phase
III of the Brenner Base Tunnel. The Phase III includes the construction of the
main tunnels and the remaining sections of the exploratory tunnels leading the
main tubes. Contact Brenner Base Tunnel BBT SE, attn Avv. Arturo Piero
Mazzucato, Bolzano, tel +39 0471 062210, fax 39 0471 062211, email
ava@bbtse.com. Visit
http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=429434-2017.
Ref.n. AP268. 46/17.