Periodic indicative notice for the Nordmainische S-Bahn construction in Frankfurt/Main. The project includes the doubling from 2 to 4 track of the existing S-Bahn Rhein-Main line between Konstablerwache and Hanau stations and the construction of a 1.4 km Twin tube single track tunnel between Konstablerwache and Frankfurt (Main) Ost stations. Estimated date of publication of contract notice: 01/07/2022.
Contact DB Netz AG, attn Silke Strahl, Frankfurt, tel +49 6926545609, fax +49 6926520071, email silke.strahl@deutschebahn.com. For further tender information please click here. 16/21.