The Consortium La Linea composed of Constructora Conconcreto SA (50%) and CSS Costructores SA (50%) secured the EUR64.58 million (COP224.41 million) contract, excluding VAT, for the completion of the final 12% of the 8.8 km-long La Linea tunnel project and the second Calarca - Cajamarca roadway. Contact Instituto Nacional de Vías – INVÍAS, Bogotà, email pliego@invias.gov.co. Visit https://www.contratos.gov.co/consultas/detalleProceso.do?numConstancia=17-11-6593805. Ref. SA-DO-GTL-013-2017. 29/17.