Postponed from 17.02.2014 to 03.03.2014 the deadline of the open invitation to tender for the partial refurbishment of the 13,972 m-long Arlberg tunnel on the S16 Arlberg expressway. The contract includes new safety routes through the supply air duct and the restoration of E&M equipment. Duration of contract from 01.09.2014 to 30.09.2017. New added information to the relevant corresponding tender documents. Contact Eng. Ulrich Engbert, Asfinag AG, Vienna, tel +43 5010814485, fax +43 5010814482, e-mail ulrich.engbert@asfinag.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=050745-2014. Ref. 2013/@AVA ID-Nr: 24476. 08/14.