ILF secured contracts to design four modules of the S10 Muehlviertler expressway between Linz and the Czech border. Modules 01, 02 and 03 cover technical project engineering (road design, tunnel design, structural design) for the south, central and north sections. Modules 02 and 03 have been won in partnership with Rinderer & Partner, Ingenieurbüro Kronawetter and Kirsch - Muchitsch und Partner. Modules 02 and 03 contain technical project engineering on a length of approximately 25.5 km, with five bored tunnels, seven cut-and-cover tunnels and more than 30 bridges. ILF will mainly be responsible for project coordination and road and tunnel design. ILF also won module 04, which is the project management for the complete 37.5 km section of the S10. Read E-News Weekly 45/2004. Visit www.ilf.com, www.rinderer-partner.at, www.ibk.co.at and www.kmp.co.at 33-34/05. Subscribe to E-News Weekly 33/2005.Freiland Umweltconsulting and ILF secured module 05 (environmental coordination and consultancy for dumps, soil and subsoil). Visit www.freiland.at 33-34/05.Open call for tenders, deadline 13th August, 2007 for groundwater preservation during construction of the Unterweitersdorf-Freistadt North section of the Muehlviertler expressway S10. The route of the Muehlviertler expressway S10 extends the existing Muehlkreis motorway A7 from Unterweitersdorf with a long tunnel section across Neumarkt and Lest to Freistadt in the south. More details in E-News Weekly 33/2005 & 45/2004. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=143966-2007, OJ S 117, or contact ASFINAG, Vienna, fax +43 5010814420. E-mail baumanagement@asfinag.at 26/07.Restricted call for bids, deadline 20th November, 2007 for technical planning of the Satzinger Siedlung and Manzenreith tunnels on the Unterweitersdorf-Freistadt North section of the Muehlviertler expressway S10. The Satzinger Siedlung and Manzenreith tunnels are located between Freistadt South and Grünbach / Sandl (road B 38). The Satzinger Siedlung tunnel is approx. 290 m long and the Manzenreith tunnel is approx. 700 m long. Both are twin-tube tunnels. The south end of the Manzenreith tunnel will be extended by a noise protection gallery of approx. 250 metres. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=239467-2007, OJ S 197, or contact ASFINAG, Vienna, fax +43 5010814420. E-mail baumanagement@asfinag.at 42/07.Restricted call for bids, deadline 20th November, 2007 for technical planning of the Götschka tunnel on the Unterweitersdorf-Freistadt North section of the Muehlviertler expressway S10. The approx. 4.4 km Götschka tunnel includes the Linz-bound tube carrying two 3.5 m lanes and the Prague-bound tube carrying three 3.5 m lanes. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=239464-2007, OJ S 197, or contact ASFINAG, Vienna, fax +43 5010814420. E-mail baumanagement@asfinag.at 42/07.Restricted call for bids, deadline 20th November, 2007 for technical planning of the Neumarkt tunnel on the Unterweitersdorf-Freistadt North section of the Muehlviertler expressway S10. The existing 1.4 km Neumarkt tunnel will be doubled by a second bored tube of approximately the same length and both tubes will be extended to the north by an approx. 600 m cut-and-cover portion. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=239463-2007, OJ S 197, or contact ASFINAG, Vienna, fax +43 5010814420. E-mail baumanagement@asfinag.at 42/07.BGG Consult and ESW Consulting Wruss pocketed a EUR660,500 for groundwater preservation during construction of the Unterweitersdorf-Freistadt North section of the Muehlviertler expressway S10. The route of the Muehlviertler expressway S10 extends the existing Muehlkreis motorway A7 from Unterweitersdorf with a long tunnel section across Neumarkt and Lest to Freistadt in the south. Read E-News Weekly 33/2005 & 45/2004. Visit www.bgg.at 49/07.Restricted call for tenders, deadline 31st January, 2008 for geology, hydrogeology, geotechnics, geomechanics and groundwater mapping for the Unterweitersdorf-Freistadt North section of the Muehlviertler expressway S10. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=304076-2007, OJ S 248, or contact ASFINAG, Vienna, fax +43 5010814420. E-mail baumanagement@asfinag.at 02/08.Open call for tenders, deadline 11th February, 2008 for work supervision during core drilling and ground investigation works, as part of the Unterweitersdorf-Freistadt North section of the Muehlviertler expressway S10. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=303864-2007, OJ S 248, or contact ASFINAG, Vienna, fax +43 5010814420. E-mail baumanagement@asfinag.at 02/08.Open invitation to tender, deadline 4th November, 2008 for site inspection and monitoring in the construction phase of the Unterweitersdorf-Freistadt North section of the Muehlviertler expressway S10. The project includes the 2 x 4.4 km Götschka tunnel and the second tube of the 1.4 km Neumarkt tunnel. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=244092-2008, OJ S 184, or contact ASFINAG Bau Management, Vienna, fax +43 5010814420. E-mail baumanagement@asfinag.at 40/08.