The JV BG AFRY Austria GmbH from Vienna, GWU Geologie-Wasser-Umwelt GmbH from Salzburg, Geo.zt gmbh from Hall i. Tirol have secured the EUR 1.41 million contract, excluding VAT, for the construction and hydrogeological documentation for the construction of the Freistadt Nord - Rainbach Nord section (Lot 1 and Lot 2) part of the Muehlviertler expressway S10, including the Vierzehn tunnel (995 m).Contact Asfinag, att Eng. Robert Schnabl, Vienna, tel +43 050108-14446, fax +43 50108-14446, email nicole.obermueller@asfinag.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=527983-2023. Ref.n. 2023/PROVIA ID-N. 99096. 37/23.