Poyry's Urban and Mobility business group has been awarded an assignment by OBB Infrastruktur AG (Vienna) for the project Koralm Railway Tunnel (KAT2). The value of Poyry's assignment is EUR4 million. The project will be carried out in cooperation with 3G Gruppe Geotechnik Graz ZT GmbH and is scheduled for completion end-2016. Poyry's services cover the geological and hydrogeological documentation as well as the geophysical investigation ahead of the tunnel face. The 32.9 km-long Koralm tunnel is a key element of the new Koralmbahn between Graz and Klagenfurt in the south of Austria. Visit www.oebb.at, www.poyry.com and www.3-g.at. 14/11.