Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Austria

Austria, Styria & Carinthia - at/42

High Speed Railway

The Austrian railway company OEBB Infrastructure AG awarded to PORR Bau GmbH the EUR297 million contract for the KAT3 final construction section (KAT3) of the Koralm railway tunnel.

This major project involves construction of the two tunnel tubes with a total bore length of 21km.

For the southern existing 7.6 km long tunnel will be widened to the full profile. In addition, a further 3.3 km of new tunnel will be built in the full profile. The northern tube with a length of 12.6 km will be driven by using a TBM. Visit  https://porr-group.com and https://worldofporr.com. 31/13.




Permalink