The JV Bernard Ingenieure ZT GmbH/Fuerlinger Ingenieurkonsulent fuer Technische of Hall in Tirol secured the EUR945,947.81 contract, excluding VAT, for geological documentation and technical evaluation for excavation materials and wastewater management in conjunction with the planned construction of the second tube of the Klauser (2.2 km), Traunfried (0.4 km), Spering (2.9 km) and Falkenstein (0.8 km) tunnels on the Pyhrn motorway A9. Contact ASFINAG, att.n Eng.Gottfried Josef Reinisch, Vienna, tel +43 5010814474, fax +43 5010814472, e-mail gottfried.reinisch@asfinag.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=323644-2014. Ref.n. 2014/@AVA ID-N. 27888. 39/14.