Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Austria

Austria, Styria & Upper Austria - at/17

Motorway

Closing Date: 05.06.2014 (Tender Closed)

Open invitation to tender, deadline 05.06.2014, for geotechnical and geodetic measurements and control surveys in connection with the construction of the second tubes of the Pyhrn highway A9, between Klaus and St. Pankraz-Hinterstoder, including the tunnels Klauser (2.2 km), Traunfried (0.4 km), Spering (2.9 km) and Falkenstein (0.8 km). The contract includes the renovation of the existing tubes. Contact DI Mag. Anna Huditz, Asfinag, Vienna, tel +43 5010814959, fax +43 5010814972, e-mail anna.huditz@asfinag.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=140237-2014. Ref.n. 2014/@ AVA ID-Nr. 28340. 18/14.



Permalink