Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Austria

Austria, Brenner - at/16

High Speed Railway

The JV Porr-Hinteregger-Condotte-Itinera from Vienna secured the EUR966.06 million contract, excluding VAT, for the construction lot H51 Pfons Brenner on the Austrian side of the Brenner Base Tunnel project. The contract includes the conventional excavation of a safety tunnel towards the North up to the 22km point and towards the South to  the border at 32.1 km. Also part of the tender is the conventional excavation at Wolf of an emergency stop with associated works and communication point at St. Jodok. The mechanized excavation of the main tubes towards the  north to the 13.5 km point and towards the South at the Brenner-Austria/Italy Border at 32.1 km point. There will be 55 bypasses and linings. Contact Brenner Base Tunnel BBT SE, attn Dr Johann Hager, Innsbruck, tel +39 (0)43 5124030, fax +39 (0)43 5124-030/110, email ava@bbt-se.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=133821-2018.

Ref.n. AP218. 13/18.



Permalink