The Joint Venture composed of BERNARD Gruppe ZT GmbH (leader of JV ÖBA Brenner) from Hall in Tirol, Pini Swiss Engineers SA from Lugano, GEOCONSULT ZT GmbH from Puch bei Hallein and IGT Geotechnik und Tunnelbau Ziviltechniker Gesellschaft m.b.H. from Salzburg secured the EUR 26.21 million contract, excluding VAT, for the general management and sites coordination for lot H41 (Sill river Gorge - Pfons) of the Brenner Basis Tunnel on the Austrian side. Contact Brenner BBT SE Brenner Basis Tunnel, Innsbruck, tel +43 5124030, fax +43 5124030110, email ava@bbt-se.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=580755-2021 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=580750-2021. Ref.n. AP356. 46/21.