Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Bulgaria

Bulgaria, Sofia - bg/17

Struma Motorway

Closing Date: 25.02.2016 (Tender Closed)


The deadline has been postponed from 25.01.2016 to 25.02.2016 for the open invitation to tender for design and construction of the 4.46 km Struma Motorway section, from km 366 + 000 to Km 370 + 460,  2 km of which is a tunnel near Jeleznitza village (Lot 3.1). Struma motorway will connect Pernik, about 20 km south west from Sophia to the Greek border. Value of the contract is EUR 102.21 million, excluding VAT. Contact National Company Strategic Infrastructure Projects, att.n Miglena Manolova, Sofia, tel 359 24243923/889025544, fax +359 24243921, e-mail office@ncsip.bg. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=28852-2016, http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=442812-2015 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=424561-2015. 05/16.




Permalink

The awarding procedure for the open invitation to tender for design and construction of the 4.46 km Struma Motorway section, from km 366 + 000 to Km 370 + 460,  2 km of which is a tunnel near Jeleznitza village (Lot 3.1) has been discontinued. Struma motorway will connect Pernik, about 20 km south west from Sophia to the Greek border. Contact National Company Strategic Infrastructure Projects, att.n Miglena Manolova, Sofia, tel 359 24243923/889025544, fax +359 24243921, e-mail office@ncsip.bg. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=129140-2017. 14/17.



Permalink

The contract for design and construction of 2km twin tube Jeleznitsa/Zheleznitsa Tunnel on Struma Motorway has been signed. It will be the longest road tunnel built in Bulgaria. The contract was awarded to DZZD AM Struma Tunnel 2018, in which includes GP Group, Global Construction and Via Plan. The value of the contract amounts to EUR94.78 million (BGN185.37 million), exclusive of VAT. Contact Road Infrastructure Agency, attn Anton Dinev, Sofia, tel +359 29173215, fax +359 29522563, email A.dinev@api.bg.  Visit http://www.api.bg/index.php/en/prescentar/novini/contract-design-and-construction-zheleznitsa-tunnel-struma-motorway-has-been-signed/

and

http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=076052-2019.

08/19.




Permalink

Open invitation to tender, deadline 19.02.2019, for design and construction of the 10.4 km section, from km 389+100 to km 399+500, on the left carriageway from Kulata to Sofia in the 23.6 Kresna - Krupnik section, of Struma Motorway (Lot 3.2.2). This Lot includes the bypass of Kresna which is 5.5 km long (from km 396+137 to km 401+691), the tunnels Tisata (171 m), Sveta Nedelya (1,3 km), tunnel Kresna 1 (358 m) and Kresna 2 (230 m), 11 viaducts with an approximate length of 5 km as well as 9 overpasses and underpasses. Value of the contract is EUR220.12 million (BGN430.53 million), excluding VAT. Duration contract 1556 days. For bid documents http://www.api.bg/PROXY/index2.php?/public/index.jsp?proc=1093. Contact Road Infrastructure Agency, attn Biserka Borisov, Sofia, tel +359 29173396, fax +359 29173398, email b.s.borisova@api.bg. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=066265-2019,

http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=525242-2018,

http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=404762-2018

and

http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=377887-2018.

08/19.




Permalink

Open invitation to tender, deadline 27.11.2017, for design and construction of the 4.46 km Struma Motorway section, from km 366 + 000 to Km 370 + 400 ( Lot 3.1).

The tender procedure is divided into 3 lots - for the Zheleznitsa tunnel

(2 km) near Jeleznitza village and for the road before and after the facility. Struma motorway will connect Pernik, about 20 km south west from Sophia to the Greek border. Value of the contract is EUR 127 million, excluding VAT. For bid documents http://www.api.bg/PROXY/index2.php?/public/index.jsp?proc=972. Contact Road Infrastructure Agency, attn Dimitar Peltekov, Sofia, tel +359 29173283, fax +359 29522563, email d.peltekov@api.bg. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=412898-2017.

42/17.




Permalink

Open invitation to tender, deadline 14.02.2019, for design and construction of 13.2 km of the Struma motorway in the 23.6 km section between Kresna and Krupnik,  through the Kresna Gorge (Lot 3.2.1). The Lot

3.2.1 includes the section on the left carriageway of the motorway, from km 375+860 to km 389+100, and the adjacent road links. In this section it will be built  the 3 tunnels Simitli (211 m), Rakitna (1 135 m) and Stara Kresna (1 052 m), 10 viaducts with a total length of 3.5 km and 3 underpasses and overpasses. Value contract EUR227.42 million (BGN444.80 million), excluding VAT. Duration contract 1556 days. For bid documents http://www.api.bg/PROXY/index2.php?/public/index.jsp?proc=1090. Contact Road Infrastructure Agency, attn Elena Asenova, Sofia, tel +359 29173396, fax +359 29173398, email e.asenova@api.bg. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=066266-2019,

http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=516343-2018,

http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=404760-2018

and

http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=381782-2018.

07/19.




Permalink