Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Germany

Germany, Dortmund - de/65

Road

  Open call for tenders, deadline 3rd December, 2002 for construction of a tunnel on road B236n in Dortmund-Berghofen, 645 m in cut-and-cover and 665 m bored. Visit http://ted.eur-op.eu.int/udl?request=Seek-Deliver&language=en&docid=156011-2002, OJ S 198, or contact Landesbetrieb StraíŸenbau Nordrhein-Westfalen, Harpener Hellweg 1 D-44791 Bochum. 43/02. Negotiated accelerated procedure, deadline 10th January, 2003 for technical consultancy and construction inspection services for a 1,310 m-long twin-tube road tunnel on road B236n in Dortmund-Berghofen. Bored length of 405 m + 260 m, cut-and-cover length of 645 m. Visit http://ted.eur-op.eu.int/udl?request=Seek-Deliver&language=en&docid=185682-2002, OJ S 233, or contact Land North Rhine Westphalia, Bochum, fax +49 2349552435. 49/02. A JV between Prof. Dr.-Ing. B. Maidl and Müller + Hereth has secured a contract for techical engineering and construction supervision for the 1,310 m-long twin-tube road tunnel on road B236n in Dortmund-Berghofen. Bored length of 405 m + 260 m, cut-and-cover length of 645 m. Visit www.imm-bochum.de and www.mueller-hereth.com 25/03.Bilfinger Berger has bagged a €37 million contract to construct a 1,310 m-long twin-tube road tunnel on road B236n in Dortmund-Berghofen. Approximately half a bored tunnel and half in cut-and-cover. Visit www.bilfingerberger.de 32/03.Open invitation to tender, deadline 27th April, 2006 for E&M equipment for the 1,310 m tunnel in Dortmund-Berghofen on road B236n. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=030716-2006, OJ S 28, or contact Landesbetrieb Strassenbau NRW, Bochum, fax +49 2349552435 or 2349552484. 08/06.



Permalink

Germany, Darmstadt - de/64

Road

Negotiated procedure, deadline 8th November, 2002 for engineering services for a 3 km northeast connection. Lot 1 requires two cut-and-cover tunnels, 1.2 km and 400 m in length. Visit http://ted.eur-op.eu.int/udl?request=Seek-Deliver&language=en&docid=151750-2002, OJ S 192, or contact City of Darmstadt, fax +49 6151 33063150. E-mail post.asv-darmstadt@hsvv.hessen.de 41/02.Open call for tenders, deadline 4th February, 2003 for construction of the 1,080 m Mühltal tunnel. Visit http://ted.eur-op.eu.int/udl?request=Seek-Deliver&language=en&docid=159061-2002, OJ S 209, or contact Amt für StraíŸen- und Verkehrswesen, Darmstadt, fax +49 615133063150. E-mail post.asv-darmstadt@hsvv.hessen.de 44/02.A joint venture between Max Bögl and Swietelsky Tunnelbau will build the 1,080 m-long Mühltal tunnel on road B426n. Visit www.max-boegl.de and www.swietelsky.at 39/03.Open call for tenders, deadline 5th October, 2005 for electromechanical equipment of the 1,080 m single-tube Muehltal tunnel on road B 426 n. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=141352-2005, OJ S 142, or contact Amt fuer Strassen- und Verkehrswesen Darmstadt, Darmstadt, fax +49 33063150. E-mail post.asv-darmstadt@hsvv.hessen.de 31-32/05.OSMO received a EUR2.6 million contract for electromechanical equipment of the 1,080 m single-tube Muehltal tunnel on road B 426. Visit www.osmo-anlagenbau.com 19/06.



Permalink


Stredich Beratende Ingenieure GmbH & Co. KG from Bochum secured the contract for the planning and construction supervision of the partial exchange of the active operating technology, the complete traffic engineering, automation technology, BMA and video and emergency technology of the 1080 m Lohberg tunnel on the federal road B 426. Contact Hessen Mobil Strassen- und Verkehrsmanagement Eschwege, Eschwege, tel +49 561/7667-424, fax +49 561/7667-151, email christian.richter@mobil.hessen.de. For tender information please click here

Ref.n. VG-0522-2019-0172. 30/20.



Permalink

Germany, Schweinfurt-Bamberg - de/63

Motorway

Dywidag, now part of Walter Bau, has won a €13 million contract to build the Schwarzer Berg tunnel, on the Scheinfurt-Bamberg section of motorway A70. Length 722 m, cross section 102 sq m, NATM mainly with excavator. Start in September 2002 for completion in April 2004. Visit www.walter-bau.de 37/02.Open invitation to tender, deadline 18th December, 2003 for electrotechnical equipment of the Schwarzer Berg tunnel, second tube, length 738 m, headroom of 6.55 m, and equipment renovation in the first tube, length 722 m. This tunnel is on motorway A70, from Schweinfurt to Bamberg, section Knetzgau-Eitmann. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=190900-2003, OJ S 212, or contact Autobahndirektiobn Nordbayern, Nuremberg, fax +49 9114621456. 46/03.OSMO Anlagenbau has secured a EUR3.2 million contract for the electrotechnical equipment of the second bore of the Schwarzer Berg tunnel (738 m) and renovation of the first tube (722 m). Visit www.osmo-anlagenbau.com 29/04.



Permalink

Germany, Hamburg - de/62

Railway

Open call for tenders, deadline 20th November, 2002 for construction of a twin 1,770 m tunnel, 5.8 m in diameter, to be shield-driven plus launch shaft. Visit http://ted.eur-op.eu.int/udl?request=Seek-Deliver&language=en&docid=132775-2002, OJ S 165, or contact City of Hamburg, fax +49 40428402220. 36/02.Hochtief has secured a contract to build a twin 1,770 m-long 5.8 m-diameter tunnel, to be shield-driven, a start shaft, an exit shaft and a cut-and-cover tunnel. Visit www.hochtief.de 27/03.



Permalink


Voessing Ingenieurgesellschaft mbH from Duesseldorf have secured the contract for a BIM feasibility study for the construction of a new 3 km railway connecting curve (tunnel) between Hamburg-Stade and Hamburg-Harburg railway stations. Contact DB Netz AG, attn Alexander Stojakovic, Frankfurt Main, tel +49 16097256405, fax +49 6926521083, email Alexander.Stojakovic@deutschebahn.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=328470-2022. Ref.n. 22FEI57164. 25/22. 



Permalink

Germany, Lower Saxony - de/61

Highway

Preinformation for construction of a 1.7 km double tunnel on A38 between Göttingen and Halle. Visit http://ted.eur-op.eu.int/udl?request=Seek-Deliver&language=en&docid=132724-2002, OJ S 165, or contact DEGES, Berlin, fax +49 3020243490. 36/02. Accelerated negotiated procedure, deadline 10th October, 2002 for engineering services for a section including the 1,724 m-long Heidkopf tunnel on the A38 highway. Visit http://ted.eur-op.eu.int/udl?request=Seek-Deliver&language=en&docid=146114-2002, OJ S 185, or contact DEGES, Berlin, fax +49 3020243692. 40/02. Accelerated negotiated procedure, deadline 4th December, 2002 for engineering services for the 2 x 1,720 m-long Heidkopf tunnel. Visit http://ted.eur-op.eu.int/udl?request=Seek-Deliver&language=en&docid=178663-2002, OJ S 224, or contact DEGES, Berlin, fax +49 3020243692. 48/02.Open call for bids, deadline 18th March, 2003 for construction of the Heidkopf tunnel, a 1,720 m-long twin tube. Work to start in June 2003. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=024774-2003, OJ S 30, or contact DEGES, Berlin, fax +49 3020243490. 08/03.A JV formed by Beton- und Monierbau, Stutz GmbH & Co. KG and Heinrich Rohde GmbH has won a €48 million contract to build the 1,720 m-long twin-tube Heidkopf tunnel. Visit www.bemo.net 51/03.Open call for tenders, deadline 8th November, 2005 for electro and mechanical equipment of the 2 x 1.7 km Heidkopf tunnel on highway A38, between Goettingen and Halle. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=190148-2005, OJ S 193, or contact DEGES, Berlin, fax +49 3020243691 or 3020243490. 41/05.OSMO received a EUR6.9 million contract for the E&M equipment of the 2 x 1.7 km Heidkopf tunnel on highway A38, between Goettingen and Halle. Visit www.osmo-anlagenbau.com 18/06.



Permalink

Germany, Cologne - de/60

Railway

Negotiated procedure, deadline 19th August, 2002 for construction of the Schlüchterner tunnel, including 711 m of new single-track tunnel, cross section 52 sq m (lot 1), to be TBM-driven and renovation of existing 691 m tunnel (lot 2), cross section 37 sq m, using NATM. Work to start in November 2002 and April 2005 respectively. Visit http://ted.eur-op.eu.int/udl?request=Seek-Deliver&language=en&docid=107675-2002, OJ S 137, or contact Deutsche Bahn, Cologne, fax +49 2211413543. 31/02.



Permalink

Germany, Berlin - de/59

Highway

Preinformation for the construction of lot 4 of highway A 113 including the 900 m Rudower Höhe tunnel, 240 sq m. Planners are Bung. Tenders to be invited third quarter of 2002. Visit http://ted.eur-op.eu.int/static/home/en/homepage.ini, OJ S 118, document 91634-2002 or contact Senatsverwaltung für Stadtentwicklung, Berlin, fax +49 3090123715. Also visit www.bung-gmbh.de 26/02.Negotiated procedure, deadlines 5th and 7th May, 2003 for work management including the 900 m-long 240 sq m-cross sectional Rudower Höhe tunnel (lot 4) and the 300 m Altglienicke tunnel on highway A 113. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=58822-2003 and http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=58825-2003, OJ S 67, or contact Senat Department of Urban Development, Berlin, fax +49 3090123762. E-mail carsten.wulkow@senstadt.verwalt-berlin.de 15/03.



Permalink

Germany, Freiburg - de/58

Highway

Preinformation notice for the construction of the 1,250 m Nollinger Berg tunnel, west tube on the A 861 highway. Cross section 87 to 99 sq m. Visit http://ted.eur-op.eu.int/static/home/en/homepage.ini, OJ S 104, document 82122-2002 or contact Autobahnbetriebsamt, Freiburg, fax +49 7615150450. 23/02. Open call for bids, deadline 19th November, 2002 for construction of the Nollinger Berg tunnel, west tube, 1,260 m in length, cross section 87-102 sq m, between Weil am Rhein and Schaffhausen on the A98. Visit http://ted.eur-op.eu.int/udl?request=Seek-Deliver&language=en&docid=154285-2002, OJ S 196 or contact Autobahnbetriebsamt Freiburg, fax +49 7615150450. E-mail vergabeunterlagen@staatsanzeiger.de 42/02.A JV between í–stu-Stettin, Hinteregger and Jäger has secured a €20 million contract to build the 1,260 m-long Nollinger Berg tunnel, west tube. Visit www.oestu-stettin.at, www.hinteregger.co.at and www.jaegerbau.com 26/03.



Permalink

Germany, Stuttgart - de/57

Metro

Award to a jv of Strabag and Züblin of a 940 m bored tunnel and a 229 m cut-and-cover portion for Line 2 of the Stuttgart metro. Contract value of €19.3 million. Visit www.ssb-ag.de, www.strabag.de or www.zueblin.de 17/02.Periodic notice for extension of metro line 2, with 560 m above ground and 1,090 m underground. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=069568-2003, OJ S 78, or contact Stuttgarter StraíŸenbahnen, Stuttgart, fax +49 711 78852399. E-mail juergen.hinrichs@mail.ssb-ag.de 17/03.



Permalink

Germany, North Rhine-Westphalia - de/56

Railway

A feasibility study for a Transrapid rail link from Düsseldorf to Dortmund is to be presented to the German transport ministry. There would be a 4.03 km tunnel for an estimated cost of €121 million. The stretch would cost €3.6 billion altogether, with an expected annual profit of over €60 million. Transrapid is a high-speed electromagnetic levitation train built by Siemens and ThyssenKrupp. Visit www.bmvbw.de and www.transrapid.de 05/02.



Permalink