Philippines

Philippines, Casecnan - ph/15

Hydro

  Tamrock reports that contractor CMC Pizzarotti is using its Maximatic and Paramatic jumbos. Visit www.tamrock.com January 2000.



Permalink

Philippines, San Roque - ph/14

Hydro

Tamrock reports that Raytheon Constructors is using its computer-aided Maximatic 315-120 three-boom jumbos. Product information from www.tamrock.com January 2000.  Some 8.5 km of tunnel completed, comprising 60% of total. Initial poor rock conditions overcome and project back on schedule, largely due to 95% equipment availability. San Roque Power Corporation was formed by Sithe (50.05%), Marubeni (42.45%) and Kansai Electric (7.5%) to implement and operate the project for which overall cost is $1.2 billion funded one-third by Japan Bank for International Cooperation. Station will generate 345 MW for the Luzon grid under 25-year power purchase agreement using 3 x 115 MW turbines supplied by Toshiba. The Philippine Energy Plan requires another 5/6 hydro schemes similar to San Roque to meet its target of 114,000 MW by 2035. Because the National Power Corporation is to be privatised in the near future, these will be predominantly BOT schemes. March 2000.



Permalink

Philippines, Northern Luzon - ph/13

Hydro

Bakun scheme will generate 70 MW at high head and involves much tunnelling. Design engineer Halcrow Water Power for design and construct contractor Transfield Philippines. Nov 1998.   $150 million run of river project is remotely located in the provinces of Benguet, Ilocos Sur and La Union with limited and difficult access. Sponsored by National Power Corporation under 25 year BOOT scheme to Luzon Hydro Corporation. Intake tunnel 9.2 km together with 2 km of 2.5 m-diameter steel penstock completed, but unforeseen ground conditions have necessitated steel lining of a further 1.8 km of intake which will be completed by March, 2000. Contract completion is scheduled for June, 2000. Contact through www.halcrow.com and www.transfield.com.au February 2000.  Proposal mooted for 9 km-long tunnel with mini hydro up the valley chain from power station currently under construction from which the return water will deposit in the Bakun weir enabling the plant to generate electricity for the full 12 months of the year. Visit www.halcrow.com for contact. February 2000.Cordillera Hydro, a consortium of Australian-based Pacific Hydro and the Aboitz group of the Philippines, has awarded McConnell Dowell a contract for the construction of the 4 km Kayapa diversion tunnel, as part of the AUD24 million Bakun supplemental hydro project which, when completed, will feed additional water into the Bakun AC power plant and boost the output by about 50 GWh. The project is located on the Bakun River in Luzon, about 250 km north of Manila. Excavation will be carried out by the drill/blast method using rail mounted equipment. The project also involves construction of two weirs. The project is due for completion in mid 2005. Visit www.pacifichydro.com.au and www.macdow.com.au 31-32/04.



Permalink

Philippines, Mindanao - ph/12

Hydro

Tagoloan 2 project will generate 68 MW. Halcrow Pacific appointed owner's engineer. High head with surface power station. Significant tunnelling work. Nov 1998.  Run of river project to get started in Spring, 2000 with Leighton, Australia as preferred contractor. Conveyance tunnel will be 12.1 km long and powerhouse 650 m long. Weir will hold 4 million cu m of water from a total catchment area of 533 sq km. Total energy generation capacity of 356GW. Visit www.leighton.com.au February 2000.



Permalink

Philippines, Manila - ph/11

Metro

Proposed 250 km scheme with 80 stations under review for possible BOT concession with JK International. Five stages of building, with first stage connecting Aquino International airport with North Fairview in Quezon City taking six/seven years. March 1998.Manila Department of Transportation and Communications has signed memorandum of understanding with Italian contractors Fincosit and SELI for a 10 km tunnel from Fort Bonifacio to Greenhills to be operational by 2004. Engineering studies are complete, and $700 million finance is being arranged. Legislation for land use for the tunnel is under discussion with the Metro Manila Development Authority. December 2000.



Permalink


Philippines’ Department of Transportation (DOTr) awarded to Mitsubishi Corporation (MC) the EUR1.10 bn (YEN140 bn) contract to deliver the integrated railway systems and trackwork for the Metro Manila Subway stretch extending from East Valenzuela Station in northern Manila to Terminal 3 station, which is connected to Ninoy-Aquino International Airport Terminal 3 in the south of the capital city and to Bicutan Station. The completion of the project is estimated for 2028. The subway is expected to make this journey more than an hour quicker than it currently takes by car. MC is responsible for designing, manufacturing, installing and delivering of all the systems for what will be the Philippines’ first subway line between the northern city of Valenzuela and the southern city of Parañaque. Visit https://www.mitsubishicorp.com. 07/22. 

 



Permalink


The consortium between Colas Rail (76%, leader), Thales (16%) and Egis (8%) has been awarded a EUR1billion subcontract by Mitsubishi Corporation (MC) to design and build E&M systems and trackworks for the 35-km long Metro Manila Subway Project (MMSP), entirely underground with 15 stations, linking East Valenzuela in northern Manila to Terminal 3 of Ninoy-Aquino International Airport in the south of the capital city. Visit https://www.colas.com, https://www.thalesgroup.com and https://www.egis-group.com.  10/22. 



Permalink


During a ceremony in Manila on 05/05/2022 the Department of Transportation (DOTr) officially awarded to the TTM Joint Venture, composed of Tokyu Construction Co Ltd (Japan), Tobishima Corporation (Japan) and Megawide Construction Corporation (Philippine-based) the PHP17.75 bn (EUR 321,23 million/USD340 million) Contract Package 104 (CP104) as part of the Metro Manila Subway Project (MMSP) Phase1. The contract involves the construction of two underground stations and tunnels at Ortigas North and South. Construction will start work in July with the completion date set for January 2028.

The network will span 17 stations over 27.5 km, connecting the northern part of the metropolitan area to Ninoy Aquino International Airport. This subway will reduce travel time between Quezon City and the Ninoy Aquino International Airport (NAIA) from 70 minutes to only 35 minutes, and revitalize the Philippine economy by easing traffic congestion in Metro Manila.

Tokyu's contract will apply to the roughly 3.4 km remaining for the first phase of the project. The joint venture will handle engineering work, tunnel construction and equipment installation, including that of an air conditioning and ventilation system.

To date, the Japanese Government, through the Japan International Cooperation Agency (JICA), has provided assistance amounting to YEN104 bn (EUR 768,35 million or USD 812.55 million) in the 1st part and YEN253bn (EUR1.87 bn or USD1.98 bn) in the 2nd part.

Visit https://www.pna.gov.ph and https://www.ph.emb-japan.go.jp. 20/22. 



Permalink

Poland

Poland, Masovia - pl/29

Expressway


Open invitation to tender, deadline 06/12/2023 for the design of the new 12.9 km S7 expressway section between Kiełpin and the Armii Krajowej Route (S8) in Warsaw. The new route - the northern exit and entry to Warsaw - will have a dual carriageway with three lanes. Two tunnels will be designed in Bielany (approx. 1,000 m) and Bemowo (approx. 1,100 m) and four junctions: Łomianki, Warszawa Wólka Węglowa, Warszawa Chomiczówka, Warszawa Północ (connection with the Armii Krajowej Route S8). Click here for tender/bid documents and where tenders must be sent. Value of contract EUR 10 million, excluding VAT. Duration of contract 41 months. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=716068-2023, http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=687771-2023 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=632326-2023. Ref.n. O/WA.D-3.2411.33.2023. 48/23. 

 




Permalink


Open invitation to tender, deadline 06/12/2023 for the design of the new 12.9 km S7 expressway section between Kiełpin and the Armii Krajowej Route (S8) in Warsaw. The new route - the northern exit and entry to Warsaw - will have a dual carriageway with three lanes. Two tunnels will be designed in Bielany (approx. 1,000 m) and Bemowo (approx. 1,100 m) and four junctions: Łomianki, Warszawa Wólka Węglowa, Warszawa Chomiczówka, Warszawa Północ (connection with the Armii Krajowej Route S8). Click here for tender/bid documents and where tenders must be sent. Value of contract EUR 10 million, excluding VAT. Duration of contract 41 months. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=716068-2023, http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=687771-2023 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=632326-2023. Ref.n. O/WA.D-3.2411.33.2023. 48/23. 




Permalink

Poland, Subcarpathia - pl/28

Expressway

Closing Date: 17.12.2019 (Tender Closed)


Open invitation to tender, deadline 17/12/2019, for the design and construction of the 10.3km section from the Rzeszow Południe junction (not included) to the Babica junction (included) of the S19 expressway, including a 2 km tunnel. Click here for tender documents and where tenders must be sent.Contact Gddkia, attn Agnieszka Sroczyk, Rzeszow, tel +48 178534071, fax +48 178536484, email sekretariat_rzeszow@gddkia.gov.pl. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid= 463439-2019. Ref.n. O.RZ.D-3.2410.1.2019. 40/19. 

 




Permalink

Poland, Pomerania - pl/27

Road

The consortium consisting of Porr, Gulermak and Energopol-Szczecin signed the EUR150.31million contract for the design and construction of the Świnoujście tunnel . Once the tunnel is completed in the autumn of 2022 it will provide a direct connection between Uznam and the Polish mainland.

The total length of the project is approximately 3.2 km. This includes a 1.44 km TBM-excavation using the slurry shield procedure. The breakout diameter of the tunnel will be 13.5 m. A two-way roadway will be constructed with traffic lanes with a width of 3.5 m and evacuation niches will be built using ground freezing. Visit https://porr-group.com/en/press/press-release/news/porr-konsortium-baut-tunnel-in-swinemuende-1/. 38/18.




Permalink

Astaldi Group (99,9%) and Ghella (0,01%) have been awarded the EUR 139 million contract for the construction design and building by TBM of  a 1.5 km tunnel, under the River  to link road to the islands of Uznam and Wolin to Swinoujscie. The contract includes the construction of a 860 m cut-and-cover tunnel, the installation of all E&M systems and related works. The works will be financed using European Union and state funding for the Municipality of Swinoujscie. The planned duration of works is 48 months. Visit http://www.astaldi.com/en/press-releases/astaldi-new-construction-orders-eur-243-million.

25/18.




Permalink

SWS has been awarded the €150 million contract for the final and detailed design of the road tunnel under the Swina river between the islands of Uznam and Wolin in Swinoujscie (Poland), near the German border, this is a project co-funded by the EU. SWS's client is the Consortium composed of Porr, Gulermak and Energopol-Szczecin. The contract will be implemented as a Design & Build. The 1.44 km tunnel will be excavated with a 13.5 m diameter Slurry TBM. All activities will be carried out in a BIM environment. For further information please visit http://www.swsglobal.com/2018/11/19/sws-awards-a-new-contract/ . 47/18.




Permalink


Open invitation to tender, deadline 23/02/2023, for the design, delivery, assembly, installation and servicing of a stationary device recording the average speed in the tunnel under Swina river in Swinoujscie on the DK 93 road. Click here for bid/tender documents and where tenders must be sent. Duration of contract is 182 days. Contact Gmina Miasto Swinoujscie, attn Ewa Bimkiewicz, Swinoujscie, tel +48 913212425 , email bzp@um.swinoujscie.pl. Visit https://ted.europa.eu/en/notice/-/detail/44564-2023. Ref.n. BZP.271.1.46.2022. 04/23.




Permalink

Sprint SA from Olsztyn has been awarded the EUR240,925 (PLN1.05 million) contract, excluding VAT, for the design, delivery, assembly, installation and servicing of a stationary device recording the average speed in the tunnel under Swina river in Swinoujscie on the DK 93 road. Contact Gmina Miasto Swinoujscie, attn Ewa Bimkiewicz, Swinoujscie, tel +48 913212425 , email bzp@um.swinoujscie.pl. Visit https://ted.europa.eu/en/notice/-/detail/46749-2024. Ref.n. BZP.271.1.46.2022. 04/24.






Permalink

Poland, Lublin - pl/26

Coal mine

Closing Date: 13.11.2014 (Tender Closed)

Open invitation to tender, deadline 13.11.2014, for supply of tunnelling machinery to be used in the underground Stefanow coal mine, in explosive methane and coal dust. Contract duration 140 days from award. Time limit for receipt of requests for documents or for accessing documents: 12.11.2014. Contact Lubelski Węgiel Bogdanka S.A., att.n Ryszard Metelski, Puchaczow, tel +48 814625547, fax +48 814625007. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=339720-2014. Ref.n. 72/IZS/2014. 41/14.



Permalink


The joint ventire between Hydrotech S.A.  and Deilmann-Haniel Mining Systems GmbH secured the EUR 1.63 million contract, excluding VAT, for the supply of tunnelling machinery to deal with explosive methane and coal dust which will be used underground in the Stefanow coal mine,  in. Contact Lubelski Węgiel Bogdanka S.A., att.n Paweł Fryt Puchaczow, tel +48 814625125, fax +48 814625007, e-mail pfryt@lw.com.pl. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=380406-2015. Ref.n. 72/IZS/2014. 44/15.




Permalink

Poland, Lesser Poland - pl/25

Railway

Closing Date: 07.10.2013 (Tender Closed)

Open invitation to tender, deadline 07.10.2013, for maintenance and inspection of equipment, systems automation and lighting in the railway tunnel Krakowskiego Szybkiego Tramwaju (1,420 m) in Krakow. Contact Zarząd Infrastruktury Komunalnej i Transportu w Krakowie, att.n Leszek Wesołowski, Krakow, tel +48 126167416, fax +48 126167417, e-mail sekretariat@zikit.krakow.pl. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=288896-2013 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=291654-2013. 36/13.



Permalink

Open invitation to tender, deadline 24.09.2014, for maintenance and inspection of the service equipment and plant automation systems in the 1,420 m-long Krakow fast tram tunnel. Value of contract EUR207,000, duration 01.11.2014 to 31.12.2015. Contact Zarząd Infrastruktury Komunalnej i Transportu w Krakowie, att.n Leszek Wesołowski, Krakow, tel +48 126168614, fax +48 126167416, e-mail sekretariat@zikit.krakow.pl. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=282918-2014. 34/14.



Permalink

Open invitation to tender, deadline 14.05.2015, for maintenance and reparation of security and SCADA systems in the 1,420 m-long Krakow fast tram tunnel. Value of contract EUR207,000, duration 36 months from award. Contact ZIKIT (Zarząd Infrastruktury Komunalnej i Transportu w Krakowie), Krakow, tel +48 126167416, fax +48 126167417, e-mail sekretariat@zikit.krakow.pl. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=122155-2015. 15/15.



Permalink

Additional information about open invitation to tender, deadline 14.05.2015, for maintenance and reparation of security and SCADA systems in the 1,420 m-long Krakow fast tram tunnel. Value of contract EUR207,000, duration 36 months from award. Contact ZIKIT (Zarzad Infrastruktury Komunalnej i Transportu w Krakowie), Krakow, tel +48 126167416, fax +48 126167417, e-mail sekretariat@zikit.krakow.pl. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=129104-2015. 18/15.



Permalink

Siemens at Krakow secured the EUR 704,627.13 contract, including 23% VAT, for maintenance of the security and SCADA systems in the 1,420 m-long Krakow fast tram tunnel. Contact ZIKIT (Zarząd Infrastruktury Komunalnej i Transportu w Krakowie), Krakow, tel +48 126167416, fax +48 126167417, e-mailsekretariat@zikit.krakow.pl. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=376304-2015. Ref.n. 19/III/2015. 44/15.




Permalink