The JV Astaldi (60%)/Graí±a y Montero (40%) secured the UDS116 million contract, duration 29 months, for the construction of 90 MW Huanza hydroelectric power plant. The works include the construction of a RCC (Roller Compacted Concrete) dam, a 10 km tunnel, a hydroelectric power plant and a switchyard, for completion in 29 months. Visit www.astaldi.com and www.gym.com.pe. 44/09.