Norway

Norway, Mí¸re & Romsdal - no/100

Road

Open invitation to tender, deadline 1st July, 2008 for procurement of 40 booster fans for the 3,520 m Ellingsí¸y tunnel and the 4,222 m Valderí¸y tunnel. Both are subsea tunnels leading to the í…lesund airport on road Rv 658. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=136009-2008, OJ S 101, or contact Statens vegvesen Region Central, Molde, fax +47 70175044. E-mail ole.birkeland@vegvesen.no 23/08.Skanska is the low bidder at NOK197.1 million to rehabilitate the 3,520 m Ellingsí¸y tunnel and the 4,222 m Valderí¸y tunnel in í…lesund, ahead of Mesta (NOK211.7 million) and Veidekke with NOK260.3 million. The tunnels opened in 1989. Work will take place at night, starting in September for a period of 12-17 months. New waterproofing and frost protection will be installed and new technical installations will be installed. Also, 15 niches will be built. Visit www.skanska.com 25/08.The tender for the electromechanical works has attracted four bidders - NSI (NOK39.6 million), Mesta (NOK48.5 million), Siemens (NOK41.2 million) and Kraftmontasje (NOK39.9 million). The works consists of the demolition of existing cable racks with accompanying cables and lighting equipment. The main works will be carried out at night and the tunnels will be totally closed for traffic. Fourty booster fans have to be installed in the tunnels. Visit www.nsias.no 25/08.Open invitation to tender, deadline 03.12.2008 for 2,675 m of 8.5 m-wide two-lane tunnel and associated works and installations on road Rv 858 Larseng-Vikran connection in Troms county. Tender conference and site viewing on 29.10.2008 in Tromso. Contact Kare B Tune, tel +47 771 8665, e-mail karetu@vegvesen.no 43/08.Bemel Norge (Oslo) scooped a 4,141,000 NOK contract for procurement of 40 booster fans for the 3,520 m Ellingsí¸y tunnel and the 4,222 m Valderí¸y tunnel. Both are subsea tunnels leading to the í…lesund airport on road Rv 658. 45/08. Kraftmontasje (Vestnes) scooped a 41,100,166 NOK contract for the electromechanical works in the 3,520 m Ellingsí¸y tunnel and the 4,222 m Valderí¸y tunnel. The works consists of the demolition of existing cable racks with accompanying cables and lighting equipment. The main works will be carried out at night and the tunnels will be totally closed for traffic. 45/08.Skanska scooped a NOK197.1 million contract to rehabilitate the 3,520 m Ellingsí¸y tunnel and the 4,222 m Valderí¸y tunnel in í…lesund. New waterproofing and frost protection will be installed and new technical installations will be installed. Also, 15 niches will be built. The main works shall be carried out between 18:00-06:30 and the tunnels will be totally closed for traffic.Visit www.skanska.com 43/08.Open invitation to tender, deadline 04.03.2009, for renovation of 5.086 km-long Freifjord tunnel on National Road 70 in Gjemnes and Kristiansund municipalities, including support, water/frost protection and electrical. Tunnel is three-lane on slopes and two-lane at base. Work to be carried out in evenings and at night whilst tunnel is in use. Contract commencement 03.08.2009 for completion 17.12.2010. Site survey 08.01.2009 at 11.00h. Specs and docs from Jon Magne Frisvoll at Statens Vegvesen, tel +47 9134 6384, e-mail jon.frisvoll@vegvesen.no to whom tenders and requests to participate should be addressed. http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=334755-2008 52/08.



Permalink

Open invitation to tender, deadline 08.06.2010, for construction of 700 m-long E39 Hoegsett tunnel and 970 m-long Eikrem tunnel on county road 70, with 2 km of adjoining roads and associated structures in Gjemnes and Tingvoll municipalities. Contract starts 22.09.2010 for completion 07.07.2012. Site survey at 10.00 on 20.04.2010 at Batnfjordsoera office in Gjemnes municipality. Further information, specs and docs from Odd Arild Lindseth at Statens vegvesen Region midt in Fylkeshuset, tel +47 91346383, fax +47 71274101, e-mail odd.lindseth@vegvesen.no to whom tenders or requests to participate should be sent. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=108340-2010. 15/10.



Permalink

Open invitation to tender, deadline 05.07.2010, for engineering services including construction planning, engineering design, electro installations and general consultancy during implementation stage of Oppdoelsstranda tunnel in Sundall municipality. Further information, specs and docs from Jon Magne Frisvoll at Statens vegvesen Region midt in Molde, tel +47 91346384, e-mail jon.frisvoll@vegvesen.no to whom tenders or requests to participate should be sent. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=154021-2010. 21/10.



Permalink

Open invitation to tender, deadline 01.12.2010, for delivery, assembly, connection, commissioning and start-up of radio equipment for 5.086 km-long single-tube Freifjord tunnel on national road 70 in Gjemnes and Kristiansund municipalities. Further information, specs and docs from Odd Myrvang at Statens vegesen Region midt in Molde, tel +47 95224516, e-mail odd.myrvang@vegvesen.no to whom tenders or requests to participate must be sent. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=316650-2010. 43/10.



Permalink

Open invitation to tender, deadline 18.05.2011, for construction of 7.43 km-long Oppdoelsstranda tunnel on Rv 70 from Sunndalsora to Modalan in Sundall municipality with 400 m-long cross gallery and adjoining roads. Register interest at www.doffin.no/Search/Search_Switch.aspx?ID=222606. Further information, specs and docs from Jon Magne Frisvoll at Statens vegvesen Region midt in Molde, tel +47 91346384, e-mail jon.frisvoll@vegvesen.no to whom tenders or requests to participate should be sent. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=091633-2011. 12/11.



Permalink

Norway, Nordland - no/99

Road

Open invitation to tender, deadline 17th July, 2008 for construction of a new 6 km road from Rí¸vik to Strí¸msnes (Rv 80) in Fauske municipality, whereof approx. 2,000 m is in tunnel with Norwegian profile profile T10.5. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=136006-2008, OJ S 101, or contact Statens vegvesen Region north, Bodí¸, tel. +47 75552879 / 95893792 or 75586527 / 97433003. E-mail firmapost-nord@vegvesen.no or lillian.hakstad@vegvesen.no 23/08.



Permalink

Norway, Mí¸re & Romsdal - no/98

Road

Open invitation to tender, deadline 26th June, 2008 for construction of a 1,920 m rockfall protection tunnel, Norwegian profile T5.5, and connecting roads of approx. 450 metres between Bjí¸rke and Leira on county road Rv 41 in í˜rsta municipality. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=126091-2008, OJ S 92, or contact Statens vegvesen Region central, Molde, fax +47 71274101 or 70175044. E-mail firmapost-midt@vegvesen.no or lars.brautehaug@vegvesen.no 21/08.Mesta secured a NOK89.9 million contract to construct a 1,920 m-long tunnel which will give protection from rock falls with a T5.5 profile and the connecting roads of approx. 450 m between Bjí¸rke and Leira on county road 41 in í˜rsta municipality. Visit www.mesta.no 42/08.



Permalink

Open invitation to tender using dynamic purchasing system, deadline 02.09.2009, for Contract 03 electrical installation work in 1.93 km-long Leira tunnel and 600 m of open road on Fv41 Bjorke-Leira. Contract starts 01.02.2010 for completion 05.05.2010. Specs and docs from Helene Andreassen at Statens vegvesen Region midt, tel +47 701750-53, fax -44, e-mail helene.andreassen@vegvesen.no. Tenders or requests to participate to Lars Brautehaug at same tel/fax numbers, e-mail lars.brautehaug@vegvesen.no. Site survey at 11.00 on 25.06.2009 at SV office, Fyrde, Austefjord. 25/09. http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=161935-2009



Permalink

Contract 03 for electrical installation in 1.93 km-long Leira tunnel on Fv 41 Bjorke-Leira section and associated 600 m road awarded to E.ON ES Kraftmontasje, N-6390 Vestnes, value EUR 963,555 excluding VAT. Tunnel installations will be carried out by Mestra Entreprenor AS. More from Oddbjorn Pladsen at Statens vegvesen in Molde, tel +47 81544040, e-mail firmapost-midt@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=301529-2009. 45/09.



Permalink

Norway, Oslo - no/97

Sewage

Negotiated invitation to tender, deadline 30th May, 2008 for construction of the new Midgardsormen sewage system along Akerselva and at Bjí¸rvika to Gamlebyen in Oslo. The pipeline will go into a rock and soft soil tunnel to Bekkelaget treatment plant where a pump station will be constructed. The present contract will be built using microtunnelling in soft clay (approx. 2,500 m long, 2,000 mm inner diameter), with launch and reception shafts, and drilling (500-600 mm inner diameter). The project will mainly be 8-15 mm deep. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=103258-2008, OJ S 76, or contact Oslo Kommune, Oslo, fax +47 23437241. E-mail erik.bjoranesset@vav.oslo.kommune.no 17/08.Negotiated invitation to tender, deadline 26th May, 2008 for soil investigations for the Midgardsormen project. Click no/97. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=108946-2008, OJ S 80, or contact Oslo Kommune, Oslo, fax +47 23437241. E-mail erik.bjoranesset@vav.oslo.kommune.no 19/08.Restricted invitation to tender, deadline 15th September, 2008 for construction of the Midgardsormen project. A 2 km rock tunnel with a cross-section of 25 sq m will be built from Gamlebyen to Bekkelaget treatment plant. A shaft down to a level of approx. 12 m will be constructed in Gamlebyen. An access tunnel will be bored at Bekkelaget to the upper and lower levels, -14 m and +5 m respectively, pumping station and shafts which connect the new and old facilities. An approx. 1 km long outlet tunnel with a cross-section 25 sq m is to be built from the treatment plant at Bekkelaget. This contract starts where the microtunnelling contract, published in April, ends. Click no/97. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=175338-2008, OJ S 131, or contact Oslo Kommune, Oslo, fax +47 23437241. E-mail kjell.brevik@vav.oslo.kommune.no 29/08.The awarding procedure for construction of the Midgardsormen project has been discontinued. For more information contact Kjell L. Brevik at Oslo Kommune, e-mail kjell.brevik@vav.oslo.kommune.no, fax +47 23437241. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=it&docid=005025-2009, GU S 5. 04/09



Permalink

Prior information notice by Oslo Kommune for resumption of awards procedure for intended construction of Midgardsormen preclusive sewage plant for central parts of Oslo during period 01.09.2009-30.06.2014 at total development cost of EUR106million. Project, which includes 3 km of rock tunnels with associated ramps and shafts, will be divided into lots to be described in specific announcements starting after 01.04.2009. For background to this project visit tunnelbuilder archive no/97. For more information contact Kjell Brevik at Oslo Kommune, tel +47 91679527, fax +47 23437241, e-mail kjel.brevik@vav.oslo.kommune.no. 1 http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=088347-2009 14/09.



Permalink

Award of contract to Kristian Olimb AS of Rade, tel +47 69281700, for 1.8 km of microtunnelling and pipejacking, 600 mm to 2,500 mm-diameter, in Oslo centre for Midgardsormen, value EUR23 million excluding VAT. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=240066-2009. 36/09.



Permalink

Invitation to tender by negotiated procedure, deadline 21.01.2010, for sinking S9 shaft in Gamlebyen district, cross-section 6.5 m x 12 m, through 12 m of uncompacted soil and into rock. Work to be carried out between May and November, 2010. Specs and docs from Kjell Brevik at Oslo Kommune, e-mail kjell.brevik@vav.oslo.kommune.no, fax +47 23437401 to whom tenders or requests to participate should be addressed. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=348311-2009. 51/09.



Permalink

Prior information notice of expected start of award procedures on 01.12.2010 for Lot A1, sub-project A of Midgardsormen sewerage system which involves blasting of 2 km-long x 25 sq m section transfer tunnel between Gamlebyen and Bekkelaget districts and new 900 m-long outlet tunnel and associated works at Bekkelaget. Scheduled works start date 01.05.2011 for completion 31.12.2013. More from Kjell Brevik at Oslo Kommune, fax +47 23437241. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=004250-2010. 02/10.



Permalink

Invitation to tender using restricted procedure, deadline 16.08.2010, for sub-project A, Gamlebyen-Bekkelaget of Midgardsormen sewerage project comprising 2.0 km-long x 25 sq m rock tunnel with access tunnel at Bekkelaget pumping station. Further information, specs and docs from Kjell Brevik at Oslo Kommune, tel +47 234374-16, fax -01, e-mail kjell.brevik@vav.oslo.kommune.no to whom tenders or requests to participate must be sent. Contract starts 04.01.2011 for completion 30.06.2013, estimated value EUR33.4 million. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=194776-2010. 27/10.



Permalink

Veidekke Entreprenor AS of Skoyen, Oslo has been awarded the contract, value EUR2.43 million excluding VAT, for the establishment of shaft S9 at Midgardsormen sewerage project. Further information from Kjell Brevik at Oslo Kommune, fax +47 234374-01, e-mail kjell.brevik@vav.oslo.kommune.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=197106-2010. 27/10.



Permalink

Award of contract to Veidekke Entreprenor A/S of Oslo, value EUR29.9 million excluding VAT, for sub-project A Gamlebyen-Bekkelaget section of Midgardsormen sewerage project comprising 2.0 km-long x 25 sq m rock tunnel with access tunnel, pump station and shafts at Bekkelaget and 1 km-long discharge tunnel. Further information from Kjell Brevik at Oslo Kommune, tel +47 234374-16, fax -01, e-mail kjell.brevik@vav.oslo.kommune.no and Neal Nordahl at Veidekke, tel +47 21055029, e-mail neal.nordahl@veidekke.no. Estimated contract completion date 30.06.2013. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=011591-2011. 02/11.



Permalink

Invitation to prequalify using restricted procedure, deadline 16.01.2014, for expansion of Bekkelaget treatment plant comprising 250 m-long transfer tunnel, 800 m-long access tunnel, six rock halls, technical room and 50 m-long ventilation tunnel. Start of works mid-2014. Register interest at http://www.doffin.no/Search/Search_Switch.aspx?ID=312959. Further information, specs and docs from Lars Gautvik at Oslo Kommune, tel +47 02180, internet address www.vann-op-avlopsetaten.oslo.kommune.no, to whom tenders or requests to participate must be sent. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=425627-2013. 51/13.



Permalink

Invitation to tender using restricted procedure, deadline 25.02.2014, for procurement of Fjell construction-management contract within the UBRA Project - Expansion of Bekkelaget Sewage Treatment Plant. The planned construction periods for the Fjell contract are the 2014–2016 summers. Further information, specs and docs from Lars E. Gautvik at Oslo Kommune, tel +47 02180, e-mail postmottak@vav.oslo.kommune.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=033598-2014. Ref.n. 204/2013. 06/14.



Permalink

Invitation to tender using negotiated procedure, deadline 04.03.2014, for procurement of Fjell engineering geology contract within the UBRA Project - Expansion of Bekkelaget Sewage Treatment Plant comprising six caverns, access transport and ventilation tunnels totalling 465,000 cu m of rock excavation. The planned construction periods for the Fjell contract are the 2014–2016 summers. Further information, specs and docs from Laila Olafsen at Oslo Kommune, tel +47 02180, e-mail postmottak@vav.oslo.kommune.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=038738-2014. Ref.n. 205/2013. 06/14.



Permalink

Invitation to tender using negotiated procedure, deadline 23.04.2014, for construction-management contract for expansion of Bekkelaget Sewage Treatment Plant with six extra rock halls, access, transport and ventilation tunnels. Contract starting 01.07.2014 for completion 31.12.2018, value EUR5.4-6.0 million. Further information, specs and docs from Benedicte Kjorsvik at Oslo Kommune, tel +47 02180, e-mail postmottak@vav.oslo.kommune.no, to whom tenders or requests to participate must be sent. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=096314-2014. 13/14.



Permalink

OEC Consulting AS of Lysaker secured the EUR7.35 million contract, excluding VAT for project management and AF Advansia AS at Lysaker secured the EUR3.68 million contract, excluding VAT, for construction management for expansion of Bekkelaget Sewage Treatment Plant. Contact Benedicte Kjorsvik at Oslo Kommune, tel +47 02180, e-mail postmottak@vav.oslo.kommune.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=286808-2014. 34/14.



Permalink

Sweco Norge AS from Oslo and Golder Associates AS from Drammen secured the EUR9.37 million framework agreement contract for geological consultancy and engineering design for the Oslo Municipality Water and Sewage Administration's projects and department. Contact Oslo Municipality Water and Sewage Administration, attn Ingebjorg Rogelstand, Oslo, tel +47 23440396, email ingebjorg.rogelstad@vav.oslo.kommune.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=402416-2018.

Ref.n. 163/2017. 38/18.




Permalink

Norway, South Trí¸ndelag - no/96

Water

Open call for tenders, deadline 4th April, 2008 for preliminary design for a new 1.1 km 10.1 sq m drinking water tunnel below Vikí¥sen in Trondheim municipality, connecting Vikelvdalen and Fortuna. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=32059-2008, OJ S 24, or contact Trondheim kommune, Trondheim, fax +47 72542651 or 72597070. E-mail halvard.kierulf@trondheim.kommune.no or oivind.ligard@ptl.no 07/08.



Permalink


Prequalification for negotiated invitation to tender, deadline 17.03.2016, for detailed engineering design services for the Vikasen Water Tunnel.  Duration of the contract is from 01.10.2016 to 31.12.2017. Contact Trondheim Municipality, att.n Elisabeth Nordskag, Trondheim, tel  +47 72540000, e-mail elisabeth.nordskag@trondheim.kommune.no. For electronic access to information https://kgv.doffin.no/ctm/Supplier/Documents/Folder/140604.Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=55441-2016 . Ref.n. 92320569. 07/16.




Permalink

Norway, West Agder - no/95

Road

Open call for tenders, deadline 14th March, 2008 for a construction schedule including tender documents and overview of quantity for the 2.3 km Kolsdalen-Lumberkrysset section on the new 4-lane national road Rv 456 in Kristiansand municipality. The section includes two tunnels of 350 and 650 m in length. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=27939-2008, OJ S 21, or contact Statens vegvesen Region south, Arendal, tel. +47 81548000 or 97563620. E-mail firmapost-sor@vegvesen.no or asbjhe@vegvesen.no 06/08.Norconsult of Sandvika secured the EUR2.2 million contract for construction scheduling including tender documents and overview of quantity for the 2.3 km-long Kolsdalen-Lumberkrysset section on the new 4-lane national road Rv 456 in Kristiansand municipality. The section includes two tunnels of 350 and 650 m in length. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=014553-2009, OJ S 11. Visit www.norconsult.no. 06/09.



Permalink

Open invitation to tender, deadline 15.04.2010, for construction of 2.4 km-long section of four-lane road along FV 456 between Kolsdalen and Lumberkrysset in Vaegsbygd, including two tunnels 13 m-wide x 450 m-long, two tunnels 9.5 m-wide x 800 m-long, one 650 m-long ramp tunnel of varying width, and associated works. All tunnels will be in rock, but some sections with light cover. Further information, specs and docs from Stig Berg-Thomassen at Statens vegvesen Region south in Arendal, tel +47 81548000, e-mail firmapost-sor@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=030181-2010. 05/10.



Permalink

Open invitation to tender, deadline 20.04.2012, for construction of 4 km-long section of county road FV 469 between Kvellanstrand and Kunes, including 3.2 km-long x 8.5 m-wide submarine tunnel connection to island of Hidra and associated works. Register interest at www.doffin.no/Search/Search_Switch.aspx?ID=250973. Further information, specs and docs from Bjorn Ivar Nedrejord at Statens vegvesen Region south in Arendal, tel +47 81548000, e-mail bjorn.nedrejord@vegvesen.no. Tender conference 12.03.2012, meet 12.00h at Flekkefjord traffic station. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=070778-2012. 10/12.



Permalink

Open invitation to tender, deadline 23.04.2012, for provision of external environmental monitoring services during construction of 4 km-long section of county road FV 469 between Kvellanstrand and Kunes, including 3.2 km-long x 8.5 m-wide submarine tunnel connection to island of Hidra and associated works. Contract duration 18 months. Register interest at www.doffin.no/Search/Search_Switch.aspx?ID=252748. Further information, specs and docs from Jan Helge Egeland at Statens vegvesen Region south in Arendal, tel +47 81548000, e-mail jan-helge.egeland@vegvesen.no, to whom tenders or requests to participate must be sent. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=087097-2012. 11/12.



Permalink

Open invitation to tender, deadline 07.05.2012, for geological engineering services for Fv 469 Hidra landfast. Contract duration 15.08.2012-01.09.2013. Register interest at www.doffin.no/Search/Search_Switch.aspx?ID=254144. Further information, specs and docs from Bjoern Ivar Nedrejord at Statens vegvesen Region south in Arendal, tel +47 81548000, e-mail bjorn.nedrejord@vegvesen.no to whom tenders or requests to participate must be sent. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=104824-2012. 14/12.



Permalink

The awarding procedure for construction of 4 km-long section of county road FV 469 between Kvellanstrand and Kunes, including 3.2 km-long x 8.5 m-wide submarine tunnel connection to island of Hidra and associated works, has been discontinued. Further information from Bjorn Ivar Nedrejord at Statens vegvesen Region south in Arendal, tel +47 81548000, e-mail bjorn.nedrejord@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=254851-2012. 33/12.



Permalink

Norway, More & Romsdal - no/94

Road

Open for bids, deadline 12th March, 2008 for construction of the 375 m Nakke tunnel and the 850 m Haukabí¸ tunnel on national road Rv 662 in Molde. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=18124-2008, OJ S 14, or contact Statens vegvesen Region central, Molde, fax +47 71274101. E-mail firmapost-midt@vegvesen.no 05/08.Skanska has been entrusted with the construction of the 375 m Nakke tunnel and the 850 m Haukabí¸ tunnel on national road Rv 662 in Molde. The contract amounts to NOK85.3 million and comprises four portals, the excavation and support of the tunnels, water and frost protection, and approx. 400 metres of adjacent roads. Visit www.skanska.no 24/08.



Permalink

Norway, Vestfold and Telemark - no/93

Motorway

Open call for bids, deadline 8th October, 2007 for construction plans including tender documents for the 11.5 km Sky-Langangen section on the 4-lane motorway E18 between Vestfold and Telemark counties. The section includes four twin bored tunnels: Pauler (2 x 450 m), Maleroed (2 x 250 m), Sandbekkaasane (2 x 160 m) and Hobekkseter (2 x 370 m) and one cut-and-cover tunnel in Solum (2 x 75 m). Norwegian profile T9.5. The whole distance of the project contains rocks of a plutonic complex, made up essentially of monzonitic rocks, mainly larvikite. Construction method to be drilling and blasting. Because the project runs through one of the world's richest fields of Larvikite (Norwegian pearl granite and one of the world's most precious building stones), there will be restrictions for the blasting. The expected date for publication of tenders for construction is September 2008. Work commencement is hoped for December 2008. The total cost of all five tunnels is approx NOK215 million (2006 price). Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=199985-2007, OJ S 160, or contact Statens vegvesen Region south, Arendal, fax +47 95175248. E-mail mortkl@vegvesen.no 37/07.Open invitation to tender, deadline 06.01.2009, for construction of 2 km-long section of four-lane E18 motorway Krosby-Glomma including new 1 km-long two-lane tunnel, renovation of existing two-lane tunnel, and creation of four portals. Contact Egil Kristiansen, tel +47 4145 0682, e-mail egil.kristiansen@vegvesen.no 46/08. http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=291142-2008



Permalink

Vestfold and Telemark - no/93MotorwayOpen invitation to tender, deadline 18.05.2009, for electrotechnical consultancy services, including daily follow-up and inspection of contractors, on the E18 Krosby-Knapstad section in Askim, Spydeberg and Hobol municipalities in Ostfold, which has one tunnel to be constructed. Length of contract approximately 2 man-years, value EUR230,000 - EUR340,000. More from Jorn Pettersen at Statens vegvesen in Lillehammer, tel +47 8152 2000, e-mail jorn.pettersen@vegvesen.no http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=085321-200913/09.



Permalink

Skanska Norge AS of Oslo picked up the contract for the construction of 2 km stretch of E18 Krosby-Knapstad four-lane motorway, including 1 km-long tunnel in Askim municipality, value EUR27.08 million, excluding VAT. More from Egil Kristiansen at Statens vegvesen region ost in Lillehammer, tel +47 41450682, e-mail egil.kristiansen@vegvesen.no. http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=204550-2009 31/09.



Permalink

Open invitation to tender, deadline 13.09.2010, for purchase of booster fans for six E18 tunnels in northern Vestfold county. Further information, specs and docs from Finn Erling Berg at Statens vegvesen in Arendal, tel +47 33371776/95762790/81548000, e-mail finn.berg@vegvesen.no to whom tenders or requests to participate must be sent. Tender docs available for download at www.doffin.no/Search/Search_Switch.aspx?ID=211577.Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=231675-2010. 31/10.



Permalink

Open invitation to tender, deadline 08.03.2011, for electro works on four-lane E18 motorway from Sky in Larvik municipality to Langanen in Porsgrunn municipality in open-air zones and tunnels. Contract completion deadline 15.05.2012. Further information, specs and docs from Gunnar Aarhus at Statens vegvesen Region south in Arendal, tel +47 33373136/97681391, e-mail gunnar.aarhus@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=010537-2011. 02/11.



Permalink

Award of contract 2010204772, value EUR5.4 million excluding VAT, to Otera Samferdsel A/S of Arendal for electro works on four-lane E18 motorway from Sky in Larvik municipality to Langanen in Porsgrunn municipality in open-air zones and tunnels. Further information from Gunnar Aarhus at Statens vegvesen Region south in Arendal, tel +47 81548000, e-mail firmapost-sor@vegvesen.no. Visit  http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=399416-2011. 51/11.



Permalink

Open invitation to tender, deadline 20.04.2015, for the delivery of 99 asymmetric impulse ventilators for the 2.8 km-long Larvik and 1.3 km-long Martineas tunnels on four-lane E18 motorway. Electronic access to information: https://kgv.doffin.no/ctm/Supplier/Documents/Folder/127538. Contact Statens vegvesen Region south, attn Thomas Kirkhus, Arendal, tel +47 02030, e-mail  thomas.kirkhus@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=70769-2015. Ref.n. 2014151557. 09/15.



Permalink


Open invitation to tender, deadline 21.01.2016, for repair and upgrading of the following E18 tunnels, northern Vestfold : Hanekleiv (1740 m), Loken (700 m), Hillestad (800 m), Bringaker (1130 m), Botne (1380 m) and Brekke (590 m). For electronic access to information click on https://kgv.doffin.no/ctm/Supplier/Documents/Folder/138631. Alternatively  contact Statens Vegvesen Region South, att.n Oyvind Pettersen-Da, Arendal, tel +47 02030, e-mail oyvinp@vegvesen.no. Visit  http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=440435-2015.  Ref.n. 15/226407. 51/15.




Permalink

Open invitation to tender, deadline 08.03.2016, for the management, control and monitoring services (SRO) for the tunnels Hanekleiv (1740 m), Loken (700 m), Hillestad (800 m), Bringaker (1130 m), Botne (1380 m) and Brekke (590 m) which are being modernized on the E 18 north of Vestfold this includes the island tunnel. For electronic access to information https://kgv.doffin.no/ctm/Supplier/Documents/Folder/139920. Contact the Administration Norwegian Public Roads, southern region, att.ne trond Sinnes, Arendal, tel +47 02030, email trosin@vegvesen.no. Log in http://ted.europa.eu/udl?request=Seek-Deliver&language=it&docid=30499-2016, OJ S 019. 05/16.





Permalink


One Nordic kraftmontasje from Loddingen secured the EUR17.22 million contract, excluding VAT, for repair and upgrading of the following E18 tunnels, Northern Vestfold: Hanekleiv (1740 m), Loken (700 m), Hillestad (800 m), Bringaker (1130 m), Botne (1380 m) and Brekke (590 m). For electronic access to information click on https://kgv.doffin.no/ctm/Supplier/Documents/Folder/138631. Contact Statens Vegvesen Region South, att.n Oyvind Pettersen-Da, Arendal, tel +47 02030, e-mail oyvinp@vegvesen.no. Visit  http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=221431-2016.  Ref.n. 15/226407. 26/16.




Permalink

Norway, Sí¸r-Trí¸ndelag - no/92

Highway

Open call for bids, deadline 30th November, 2007 for engineering design and construction of the southern part of the Steinberg tunnel on Trondheim's northern ring road, including a 2 km main road, whereof approx. 1.3 km of rock tunnel. Read E-News Weekly 14/2006. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=202952-2007, OJ S 163, or contact Statens vegvesen Region central, Molde, fax +47 73518382. E-mail odd-jostein.haugen@vegvesen.no 36/07.



Permalink

Norway, Aust-Agder - no/91

Hydropower

Negotiated procedure, deadline 7th September, 2007 for tunnelling works approximately 20 km, 10-20 square metres, underground power station and dam construction works. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=199988-2007, OJ S 160, or contact Otra Kraft, Kristiansand, fax +47 38607001. E-mail sveben@ae.no 35/07.



Permalink

Otra Kraft DA has signed a contract with Veidekke Entreprenor to build a new 8 km-long transfer tunnel, cross-section 14 sq m, to Brokke power station in Setesdal. This is a turnkey contract with a value of EUR22.23 million, excluding VAT. Planned completion May, 2014. For more, contact Tor Harald Haugen at Veidekke, tel. +47 95 21 82 33, e-mail tor-harald.haugen@veidekke.no. Visit http://en.veidekke.com/news-and-media/press-room/article79273.ece. 20/12.



Permalink