Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Malta

Malta, Central Region - mt/14

Stormwater relief

Closing Date: 19.07.2011 (Tender Closed)

Open invitation to tender, deadline 19.07.2011, for design and construction of Birkirkara, Gzira, and Wied-is-Sewda stormwater tunnels linking three different catchments as part of national flood relief project (NRFP-ERDF120). Contract duration 28 months, value EUR25-30 million. Tenders may be purchased and downloaded at www.contracts.gov.mt. Further information, specs and docs from the Director General at Department of Contracts in Floriana, tel +356 212-20212, fax -47681, e-mail info.contracts@gov.mt to where tenders or requests to participate must be sent. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=165444-2011. 21/11.



Permalink

Deadline for open invitation to tender for design and construction of Birkirkara, Gzira and Wied-is-Sewda stormwater tunnels linking three different catchments as part of national flood relief project (NRFP-ERDF120) postponed from 19.07.2011 to 09.08.2011. Contract duration 28 months, value EUR25-30 million. Tenders may be purchased and downloaded at www.contracts.gov.mt. Further information, specs and docs from the Director General at Department of Contracts in Floriana, tel +356 212-20212, fax -47681, e-mail carmel.mifsud-borg@gov.mt to where tenders or requests to participate must be sent. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=197115-2011. 26/11.



Permalink

Award of project, value EUR23,457,739 including VAT at 18 percent, to BM Tunnel JV of Burmarrad SPB 6073, Malta for design and construction of Birkirkara, Gzira and Wied-is-Sewda stormwater tunnels linking three different catchments as part of national flood relief project (NRFP-ERDF120). Contract duration 28 months. Further information from the Director General at Cleansing and Maintenance Department, Ministry for Resources and Rural Affairs in Floriana, tel +356 2297635/595, fax +356 21235984, e-mail carmel.mifsud-borg@gov.mt. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=050796-2012. 07/12.



Permalink

Open invitation to tender, deadline 05.06.2012, for design and construction of Zabbar-Marsascala stormwater tunnels and ancillary works as part of national flood relief project (NRFP-ERDF120). Contract duration 18 months. Tenders may be purchased and downloaded at www.contracts.gov.mt. Further information, specs and docs from the Director General at Department of Contracts in Floriana, tel +356 212-20212, fax –47681, e-mail info.contracts@gov.mt, to where tenders or requests to participate must be sent. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=113902-2012. 15/12.



Permalink

BM Tunnel JV of Malta secured the EUR6.13 million contract, including 18 percent VAT, for design and construction of Zabbar-Marsascala stormwater tunnels and ancillary works as part of national flood relief project (NRFP-ERDF120). Contact Director General at Department of Contracts in Floriana, tel +356 22927417/7423, e-mail carmel.mifsud-borg@gov.mt. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=060776-2013. 09/13.



Permalink

Malta, Maghtab - mt/13

Electricity

Closing Date: 17.03.2011 (Tender Closed)

Open invitation to tender, deadline 17.03.2011, for construction of underground service gallery from St Andrews to Maghtab with associated access and ventilation shafts. Contract duration 12 months. Further information, specs and docs from procurement section of Enemalta Corporation in Marsa, tel +356 2298-0738/-0352, fax -0660, e-mail procurement.emc@enemalta.com.mt. Tenders or requests to participate must be sent to Dept of Contracts in Floriana, tel +356 212-20212, fax -47681, e-mail info.contracts@gov.mt. Visithttp://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=025204-2011. 04/11.



Permalink

Open invitation to tender, deadline 17.05.2011, for construction of tunnel from Marsa power station to Qormi-Mosta tunnel with associated access and ventilation shafts. Contract duration 12 months. Contact point is procurement section of Enemalta Corporation in Marsa, tel +356 2298-0738/-0352, fax -0660, e-mail procurement.emc@enemalta.com.mt. Further information, specs and docs from Dept of Contracts in Floriana, tel +356 212-20212, fax -47681, e-mail info.contracts@gov.mt to where tenders or requests to participate must be sent. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=096142-2011. 13/11.



Permalink

Award of contract lot title CT 4042/2010, value EUR7,075,890 including 18 percent VAT, to Polidano Brothers of Luqa, Malta for construction of tunnel from St Andrews to Maghtab with associated access and ventilation shafts. Client is Enemalta Corporation in Marsa, tel +356 2298-0738/-0352, fax –0660, e-mail procurement.emc@enemalta.com.mt. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=073252-2012. 10/12.



Permalink

Award of contract to Rockcut Ltd of Ghaxaq, Malta, value EUR2,402,922 including 18 percent VAT, for construction of tunnel from Marsa power station to Qormi-Mosta tunnel with associated access and ventilation shafts. Contract duration 12 months. Further information from procurement section of Enemalta Corporation in Marsa, tel +356 2298-0738, fax –0660, e-mail procurement.emc@enemalta.com.mt. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=173683-2014. 21/14.



Permalink

Malta, Marsaxlokk - mt/12

Cable Duct

Replacement of overhead lines with 5 km-long underground duct carrying electricity from Delimara power station. Transmission voltage being upped from 33 kV to 132 kV. Presently installing ventilation and escape provisions in tunnel. Further information from Mike Falzon at elibrary@keyworld.net February 2000.



Permalink

Malta, Sewer - mt/11

Roadheader

Design for 6 km sewer in north of island through massive limestone beds and blue clay. Precast segmental lining in blue clay and special ling through Mizieb syncline, an aquifer supplying fresh water for the populace. Consultants Donaldson Associates, Uttoxeter, UK. September 1995.  Two changes of government and a general cash shortage caused deferral of scheme which has since been redesigned. Should now go ahead within the next two years. September 1999.



Permalink

Mexico

Mexico, State of Mexico - mx/24

Sewerage

Closing Date: 12.11.2013 (Tender Closed)

Invitation to tender, deadline 12.11.2013, for construction of the Canal General drainage tunnel, 8 km-long and 5 m-diameter, helping to reduce the risk of flooding in Chalco Valley. Contact Conagua, att.n Paulo Cesar Martinez Gutierrez e-mail paulo.martinez@conagua.gob.mx. Visit

https://compranet.funcionpublica.gob.mx/esop/toolkit/opportunity/opportunityDetail.do?opportunityId=320176&oppList=CURRENT.

Ref. n. CNA-CGPEAS-FIDE-OP-122/2013-LPN. 45/13.



Permalink

Invitation to tender, deadline 12.11.2013, for supervision during the construction of the Canal General drainage tunnel, 8 km-long and 5 m-diameter, helping to reduce the risk of flooding in Chalco Valley. Contact Conagua, att.n Paulo Cesar Martinez Gutierrez e-mail paulo.martinez@conagua.gob.mx. Visit

https://compranet.funcionpublica.gob.mx/esop/toolkit/opportunity/opportunityDetail.do?opportunityId=320180&oppList=CURRENT.

Ref. n. CNA-CGPEAS-FIDE-SER-123/2013-LPN. 45/13.



Permalink

Mexico, Mexico City - mx/23

Wastewater

Poyry awarded contract until December, 2012 to provide specialized advisory services during the construction of 62 km-long wastewater tunnel at a depth of 200 m. Contract, value EUR6.1 million, covers scheduling, risk and interface management, TBM performance monitoring, and installation of Poyry 2DOC underground data management system. Client is Comision Nacional del Agua. Visit www.poyry.com/media/media_2.html. 18/10.



Permalink

Conagua will announce tenders for proposed 14 km-long Emisor Poniente drainage tunnel in first half 2012. Project completion 3 years, value EUR291 million. Visit www.conagua.gob.mx/home.aspx. 23/11.



Permalink

Mexico, Federal District - mx/22

Motorway

Invitation to participate, deadline 15th August, 2008 in the financing, construction, operation and maintenance of the USD1.2 billion Reforma motorway tunnel project in Mexico City. This is a toll tunnel to connect Santa Fe with the National Auditorium, with estimated length ranging from 8 to 16 km. The contract is scheduled to be signed on 30th September, 2008. Click here. Visit www.capitalencrecimiento.com.mx/inversiones/Invitation_to_p_nel_project.pdf (English). To download the participation criteria (in Spanish), visit www.capitalencrecimiento.com.mx/inversiones/Supervia_Reforma_1.3_7mayo08.pdf 21/08.Invitation to participate, deadline 14th July, 2008 in the financing, construction, operation and maintenance of the USD410 million western motorway project in Mexico City from Avenida de los Poetas to Avenida Luis Cabrera. The scheme includes tunnels, bridges and expressways, with estimated length ranging from 4 to 7 km. The contract is scheduled to be signed on 21st August, 2008. Click here. Visit www.capitalencrecimiento.com.mx/inversiones/Invitation_to_p_way_Project.pdf (English). To download the participation criteria (in Spanish), visit www.capitalencrecimiento.com.mx/inversiones/Supervma%20Ponien_%20_23abr08_.pdf 21/08.



Permalink

Mexico, States of Durango and Sinaloa - mx/21

Highway

International invitation to tender, deadline 13th May, 2008 for construction of the Durango-Mazatlí¡n highway from Km 111+000 to Km 156+956. This section includes 28 tunnels and 14 bridges. It will take 1,292 days, which means the section must be completed in 2011. Work is programmed to commence on 26th June. The project is part of the national infrastructure plan to connect the country's Pacific coast to the Gulf of Mexico and also aims to position Mexico as a vital link for Asia-US trade by serving as a competitive option to the Panama Canal. The highway is expected to become Mexico's third most important continental entrance for Asian imports to the US, along with the Manzanillo and Lí¡zaro Cí¡rdenas ports, in western Colima and Michoací¡n states, respectively. The 1,250 km highway runs from Mazatlí¡n municipality in Sinaloa state, eastwards to the Durango state capital of the same name, crossing the Sierra Madre mountain range in western Mexico. Visit http://dof.gob.mx/nota_detalle.php?codigo=5016478 11/08.The Secretariat for communications and transport (SCT) has awarded three civil works contracts to complete the Durango-Mazatlí¡n highway. The three contracts have a value MXP8,721 million and the project has to be completed in early 2012. The highway is one of the biggest and costliest infrastructure project in the country because it crosses the Sierra Madre Occidental mountain range, which requires the construction of numerous tunnels and bridges. The Durango-Mazatlí¡n highway will connect the Pacific coast of Mexico with the centre and north of the country and then with the Gulf of Mexico. In all, the highway stretches for 230 kilometres and will have 63 tunnels, 115 structures and the Baluarte bridge, which will cross the Baluarte river at an height of 394 metres. The highway will link the major corridors in the north and centre of the country: Mazatlí¡n-Durango-Torreí³n-Saltillo-Monterrey-Matamoros and Mazatlí¡n-Durango-Zacatecas-San Luis Potosí­-Tampico. Visit www.sct.gob.mxA Mexican-Spanish consortium comprising Mexican firms Omega Corp and Concesiones Aldesem, and Spanish company Aldesa Construcciones won the first, MXP3,971 million contract, which includes the construction of 45.9 km of two-lane highway (12 m wide) from 111+000 to km 156+956 (from Las Adjuntas to Baluarte bridge), including 26 tunnels and 14 bridges. The entire section is situated in Durango state. Omega Corp. will sign the contract on 4th August. Work is scheduled to start on 12th August and is expected to take 3.5 years. Visit www.grupo-omega.com and www.aldesa.es 32-33/08.The second contract, from km 158+080 to km 168+400, has been awarded to a consortium of companies formed by Tradeco Operacií³n Internacional, Tradeco Industrial, Innovaciones Técnicas en Cimentacií³n, Marcadores de Pavimento and Condux. The works included in the contract are as follows: 10.3 kilometres of roadway, 15 tunnels and six bridges. All the works will be located in the state of Sinaloa. The contract is worth MXP2,560 million and has to be completed within 1,098 calendar days. Visit www.tradeco.com.mx 32-33/08.The third contract, from km 168+400 to km 186+300, involves the construction of 17.9 kilometres of road, 16 tunnels and 12 bridges. The contract has been scooped by FCC in joint venture with La Peninsular. The amount of the contract is MXP2,190 million, with a time frame of 1,183 calendar days to finish the job. Visit www.fcc.es 32-33/08.The communication and transport ministry (SCT) awarded this summer three contracts worth a total of MXP8.22 billion to complete the final section of the Durango-Mazatlí¡n highway. The first contract was awarded to a consortium led by Mexican construction firm Omega Corp. with a price tag of MXP3.97 billion. The second contract went to a consortium made up of Spain's FCC and Mexico's La Peninsular for MXP2.19 billion. The remaining contract was awarded to Mexico's Tradeco Industrial for MXP2.06 billion. The first stage of the highway includes a single carriageway, 12 m wide, and the second carriageway will be built in a second phase. The contracts involve only the first stage. Click mx/21.Given the geography of this mountainous area, the highway requires many tunnels and bridges. Altogether, 57 short single-tube tunnels will be built, representing a total length of 18.3 km. The only tunnel to exceed one kilometre in length is El Sinaloense (2,794 m). To see the list of the tunnels in each contract, click here. Once completed, travel time on the highway will drop from six hours to two and a half hours. 41/08.



Permalink

Mexico, Puebla and Vera Cruz - mx/20

Motorway

The Comunication and Transport Secretariate (SCT) of Mexico awarded to Global Ví­a Infraestructuras, a company jointly owned by FCC and Caja Madrid, a EUR400 million contract to design, build, operate and maintain the 85 km Nuevo Necaxa-Tihuatlí¡n motorway. The project comprises the construction, operation and maintenance of the 37 km Necaxa-Avila Camacho section and the operation and maintenance of the 48 km Avila Camacho-Tihuatlí¡n section. The scheme requires the construction and/or operation of 12 tunnels, among which nine tunnels on the Necaxa-Avila Camacho section: Huahuchinango (108 m), Necaxa (940 m), Cuahueyatla (620 m), Xicotepec I (247 m), Xicotepec II (832 m), El Zoquita (627 m), Las Pilas I (215 m), Las Pilas II (512 m), and La Ardilla (175 m). Construction is slated to commence in 2008 once the design phase is completed. Visit www.fcc.es and www.pps.sse.gob.mx/docs/pres_taller_gral_300606.pdf 30/07.



Permalink

Mexico, State of Mexico - mx/19

Sewage

  ICA pocketed a MXP437 million contract to construct the Rio de la Compania tunnel, in the State of Mexico. The contract, awarded by the National Water Commission, will be executed over a period of 817 days. The project is part of the drainage works in the Valley of Mexico and will provide significant relief from rain and waste water in the Chalco and Ixtapaluca valleys and for the urban settlements along the Mexico City-Puebla highway corridor. The tunnel, with a total length of 6.78 km and an external diameter of 6.24 m, will be constructed along the left bank of the Rio de la Compania, from the municipality of Valle del Chalco-Solidaridad, in the State of Mexico, to the municipality of Ixtapaluca, where it will empty into the Rio de la Compania. Visit www.ica.com.mx and www.cna.gob.mx 25/06.



Permalink