Norway, Sor-Trondelag - no/106

E6 Motorway

 Prior information notice of construction work on 5 km of four-lane E6 motorway at Trondheim and 5 km of four-lane E6 motorway at Stjordal. Work at Trondheim includes EUR68 million concrete tunnel for prequalification 2008, EUR97 million rock tunnel to be published Spring 2009, and EUR11.4 million electro tunnel to be published 2012. Work at Stjordal includes EUR14 million Tang concrete tunnel to be published early Summer 2009. Award procedures start 12.12.2008. Contact Harald Johnsen, tel +47 9151 2885, e-mail harald.johnsen@vegvesen.no 47/08. http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=296050-2008 47/08.Open invitation to tender, deadline 09.02.2009, for building condition survey prior to commencement of construction work for three tunnel portals, 2 km of two-lane tunnel and ramp tunnels, as part of E6 Nidelv bridge project. Contact Arnstein Mehlum at Statens Vegvesen, tel +47 9132 0842, e-mail arnstein.mehlum@vegvesen.no to whom tenders and requests to participate should be sent. http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=334769-2008 52/08.Four-year contract for construction management of the E6 Trondheim-Stjordal motorway section awarded to Prosjekt-og teknologiledelse AS of Flatasen, Norway who will encounter difficult ground conditions, deep building pit, moving houses and concrete tunnels. Statens Vegvesen contact Harald Johnsen at Molde, tel +47 9151 2885, e-mail harald.johnsen@vegvesen.no. 08/09.



Permalink

Contract for architectural, construction, engineering and inspection services in densely built-up areas of Nyhavna, Mollenberg, Kuhaugen and Strindheim in Trondheim awarded to Multiconsult AS, Sluppenvegen 23, N-7486 Trondheim, Norway, tel +47 725669-00, fax -20, e-mail trondheim@multiconsult.no. A 2 km-long two-lane tunnel and ramp tunnels, together with three portals and a road trough are to be excavated using drill/blast techniques. More from Arnstein Mehlum at Statens vegvesen in Trondheim, tel +47 91320842, e-mail arnstein.mehlum@vegvesen.no http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=084184-2009 13/09.



Permalink

Open invitation to tender, deadline 03.08.2009, for third construction stage of E6 motorway Vaernes-Havnekrysset including 450 m-long continuous concrete structure to provide tunnel beneath Vaernes airport runway and taxiway in Stjordal municipality. Contract starts 20.09.2009 for completion 01.10.2011, value EUR9.6-10.8 million (excluding VAT). Further information, specs and docs from Odd Kare Myren at Statens vegvesen Region midt in Molde, tel +47 74122132, e-mail odd.myren@vegvesen.no to whom tenders or requests to participate should be sent. http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=130218-2009 20/09.



Permalink

Open invitation to tender, deadline 16.10.2009, for engineering design services and construction of Tangtunnelen, part of the main road project E6 Trondheim-Stjordal, section Vaernes-Havnekrysset, comprising a 495 m-long concrete construction of which 350 m is four-lane tunnel. Contract value EUR13.2-13.75 million, duration 20.11.2009 to 01.09.2011. Further information from Lars Bjorgaard at Statens vegvesen Region midt, Fylkehuset in Molde, tel +47 91339511, e-mail lars.bjorgaard@vegvesen.no Tenders or requests to participate should be sent to SV at N-7500 Stjordal, attn Lars Bjorgaard. http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=185867-2009 28/09.



Permalink

Open invitation to tender, deadline 13.10.2009, for construction of twin-tube 2.14 km-long T9.5 profile Strindheim rock tunnel with 140 m-long concrete extension and two T7 profile ramp tunnels totalling 840 m with 90 m of concrete extension. All ramp tunnels have low cover and will require roof reinforcement and cautious blasting. The works are part of E6 European road Trondheim-Stjordal, Trondheim section. For more information contact Amstein Mehlum at Statens vegvesen Region midt in Molde, tel +47 91320842, e-mail amstein.mehlum@vegvesen.no Tenders or requests to participate should be sent to SV at N-7042 Trondheim, att Amstein Mehlum. http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=185868-2009 28/09.



Permalink

Contract to construct 2.14 km-long Strindheim tunnel with 840 m of ramps and 230 m of concrete extensions awarded to Skanska, value EUR85 million. For more project history, visit tunnelbuilder archive no/106 or contact amstein.mehlum@vegvesen.no. 49/09.



Permalink

Contract, value EUR6.6 million excluding VAT, for construction of E6 Vaernes-Havnekrysset section in vicinity of Vaernes and Tang tunnels awarded to Grunnarbeid AS of Ranheim, tel +47 73575000, e-mail firmapost@grunnarbeid.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=331269-2010. 45/10.



Permalink

Open invitation to tender, deadline 07.12.2011, for detailed engineering design, supply and installation of electrical system in twin-tube 2.14 km-long T9.5 profile Strindheim rock tunnel and open areas. For more information, specs and docs contact Jo Forren at Statens vegvesen Region midt in Molde, tel +47 90130083, e-mail jo.forren@vegvesen.no, to whom tenders or requests to participate should be sent. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=313436-2011. 41/11.



Permalink

Award of turnkey contract, value EUR10.36 million excluding VAT, to Kb-Elteknik of Ry, Denmark www.kb-elteknik.dk for detailed engineering design, supply and installation of electrical system in twin-tube 2.14 km-long T9.5 profile Strindheim rock tunnel and open areas. For more information, contact Jo Forren at Statens vegvesen Region midt in Molde, tel +47 74122000, e-mail jo.forren@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=056020-2012. 08/12.



Permalink

Kb-Elteknik (Ry) secured the EUR10.31 million contract, VAT not included, for detailed engineering design, supply and installation of electrical system in twin-tube 2.14 km-long T9.5 profile Strindheim rock tunnel and open areas. Contact Jo Forren at Statens vegvesen Region midt in Molde, tel +47 74122000, e-mail firmapost-midt@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=056020-2012 and www.kb-elteknik.dk. 13/12.



Permalink

Open invitation to tender, deadline 05.09.2013, for consulting and engineering services for preparation of complete zoning plan for 22.9 km-long E6 extension between Ranheim and Vaernes including three tunnels totalling 7.3 km of the route. Register interest at www.doffin.no/Search/Search_Switch.aspx?ID=299093. Time limit for receipt of requests for documents or for accessing documents: 23.08.2013. Further information, specs and docs from Stein Brembu at Statens vegvesen Region midt in Molde, tel +47 48039306, e-mail stein.brembu@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=220869-2013. 27/13.



Permalink

Open invitation to tender, revised deadline 19.09.2013, for consulting and engineering services for preparation of complete zoning plan for 22.9 km-long E6 extension between Ranheim and Vaernes including three tunnels totalling 7.3 km of the route. Register interest at www.doffin.no/Search/Search_Switch.aspx?ID=299093. Time limit for receipt of requests for documents or for accessing documents: 23.08.2013. Further information, specs and docs from Stein Brembu at Statens vegvesen Region midt in Molde, tel +47 48039306, e-mail stein.brembu@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=227537-2013. 28/13.



Permalink

Competitive procedure with negotiation, deadline 27/06/2017, for the E6 Soknedal project, lot Vindasliene-Korporalsbrua. The contract involves the construction of the 3.6 km Soknedal tunnel (profile T10.5)and the completion and installation of electrical works,  the construction of a new 2.9 km road as part of the E6 in with a two level interchange south of Soknedal centre, a 1.7 km local road system with 2 bridges as well as retaining walls. Value of the contract is EUR95.94 million, excluding VAT. Contact the Norwegian Public Roads Administration, Middle Region, Molde, attn  Idar Lillebo, tel +47 90020552, email idar.lillebo@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=053237-2017,  http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=171112-2017,  

http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=195108-2017.

. Ref.n. 16/175120. 21/17.



Permalink

Prior information notice with call for competition, deadline 11/12/2017, for the preparation of a development plan, engineering design services, construction and possibly maintenance and operation of 22.9 km-long E6 extension between Ranheim and Vaernes including three tunnels totalling 7.3 km of the route. For tender documents please click here where tenders must be sent. Value contract EUR367.22 million (NOK4.0 bn) contract, excluding VAT. Contact Nye Veier AS, attn Freddie Fosse, Kristiansand, tel +47 40435140, email freddie.fosse@nyeveier.no. For further tender information please click here. 45/17.



Permalink

Acciona Construccion SA from Alcobendas secured the EUR385.88 million (NOK4.2 bn) contract, excluding VAT, for the preparation of a development plan, engineering design services, construction and possibly maintenance and operation of 22.9 km-long E6 extension between Ranheim and Vaernes including three tunnels totalling 7.3 km of the route. Contact Nye Veier AS, attn Freddie Fosse, Kristiansand, tel +47 40435140, email freddie.fosse@nyeveier.no. For further tender information please click here . 41/18.



Permalink


Ramudden AS from Vinterbro secured the EUR1.74 million (NOK20 million) contract, excluding VAT, for the delivery of equipment and services for seeing to traffic safety after the cancellation of the turnkey contract for the stretch E6 Ranheim - Vaernes.  

Contact Nye Veier AS, attn Ruben Ramsland, Kristiansand, email ruben.ramsland@nyeveier.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=492879-2023. 33/23. 



Permalink


Awarded the contracts for minor works on the E6 Ranheim-Værnes project until the general contract work can commence with new contractors after the conclusion of the turnkey contract. Work mainly consists of the completion of limited assignments that have already been started and are considered time-critical.  

  • Brodrene Bjerkeli AS from Stjordal secured the EUR4.79 million (NOK55 million) contract, excluding VAT, for greenwall including Hoybybekken (Lot 1) and EUR1.57 million (NOK18 million) contract, excluding VAT, for the Helltunnelen - Guideways for electrical and completion of water and sewage systems (Lot2). 
  • Grunnarbeid Entreprenor AS from Ranheim secured the EUR521,885 (NOK6 million) contract, excluding VAT, for Leistad to Væretunnell - Completion of water pipelines (Lot 3) and the EUR 95,897 (NOK1.10 million) contract, excluding VAT, for Forbord culvert - Wastewater pipelines (Lot4). 

Contact Nye Veier AS, attn Ruben Ramsland, Kristiansand, email ruben.ramsland@nyeveier.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=618561-2023. 41/23. 

 




Permalink


Negotiated procedure with prior publication of a call for competition, deadline 25/01/2024, for the engineering design services and the construction of the E6 between Ranheim and Sveberg. The contract includes completion of a four-lane motorway from Ranheim to Sveberg for 110 km/h. The stretch is approx. 12.5 km long, divided between 10.8 km roads in open air and the 1.7km Vaere tunnel. For tender documents please click here where tenders must be sent. Value of the contract is EUR194 million (NOK2.20 bn), excluding VAT. Contact Nye Veier AS, attn Ruben Ramsland, Kristiansand, tel +47 47972727, email ruben.ramsland@nyeveier.no. Visit  https://ted.europa.eu/en/notice/-/detail/765610-2023. 51/23.


 




Permalink


The three contractors AF Gruppen Norge AS, Veidekke Entreprenør AS and Hæhre Entreprenør AS have been invited to make offers for the E6 between Ranheim and Sveberg in Trøndelag. 

The project consultant, Rambøll Norge AS, will be transported to the general contractor after the competition has ended, and there are therefore no qualification requirements for design references in the competition.  

E6 Ranheim-Sveberg is part of the section E6 Ranheim-Værnes. The latter stretch was split in two after Nye Veier ended its collaboration with the Spanish contractor Acciona last summer. The competition that is currently underway thus includes completion of the approx. 15 km stretch between Ranheim and Sveberg with the 1.7km Vaere tunnel.

The contract will be based on NS8407 – Total contract with target price. A negotiation phase will be carried out to determine the final work description and target price after the general contractor has been selected. The contract size is estimated at EUR194 million (NOK2.20 bn), excluding VAT. It is expected that the offer phase, which is now starting, will last until the middle of June, and that the contract can be signed at the beginning of July. Contact Nye Veier AS, attn Ruben Ramsland, Kristiansand, tel +47 47972727, email ruben.ramsland@nyeveier.no. Visit https://kommunikasjon.ntb.no. 09/24.

 




Permalink