Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Italy

Italy, Lombardy - it/128

Highway

Restricted call for tenders, deadline 10th September, 2007 for final and construction design as well as construction of the first lot of Como orbital motorway, first lot of Varese orbital motorway, the A8-A9 section of the highway connection between Dalmine, Como, Varese and Gaggiolo Pass and associated works. This 87 km project, named Pedemontana highway, includes 40 kilometres of tunnel. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=168844-2007, OJ S 137, or contact Autostrada Pedemontana Lombarda, Milan, fax +39 0267741256. E-mail posta@pedemontana.com 33/07.Restricted call for tenders, deadline 10th September, 2007 for final design for sections B1, B2, C, D, second lot of the Como orbital motorway, second lot of Varese orbital motorway of the highway connection between Dalmine, Como, Varese and Gaggiolo Pass and associated works. This 87 km project, named Pedemontana highway, includes 40 kilometres of tunnel. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=170809-2007, OJ S 138, or contact Autostrada Pedemontana Lombarda, Milan, fax +39 0267741256. E-mail posta@pedemontana.com 33/07.The four bidders to construct the Pedemontana highway in Lombardy are Strabag, Sacyr, CCC, and Impregilo. Pedemontana means foothills in Italian. A "pedemontana" is generally a road at the foot of a mountain or hills. The project comprises a main highway connection from the A8 in Cassano Magnano in Varese province to the A4 in Osio Sotto and Brembate in Bergamo province, the Varese bypass highway and the Como bypass highway. The entire project stretches for 77 km. More than 48 km of connecting roads, either new or upgrades of existing roads, is also necessary. About 59.5% will run at grade, 5.6% on viaduct and 34.9% in tunnel. The highway will carry three lanes and an emergency lane per direction between Meda and Vimercate in Milan province, while all the other roadways will carry only two lanes and an emergency lane in each direction. Visit www.pedemontana.com 45/07.On 29th April, 2008, a consortium headed by Impregilo has been provisionally awarded a contract worth about EUR630 million for the final and constructional designs and construction of the first stretch of the Pedemontana Lombarda motorway, from highway A8 in Cassano Magnago to highway A9 in Lomazzo, and the first sections of the Como and Varese bypass roads and associated works. The contract is expected to be signed in July 2008. Impregilo, which has been named as general contractor in the deal, said it owned 47% of the consortium. Italian builder Astaldi holds a 24% share. The other consortium members are private companies Pizzarotti (18%) and Itinera (11%). The project involves the construction of approximately 47 km of motorway and secondary roads, about 13 km of tunnels as well as 1.7 km of bridges and viaducts. Construction work is scheduled to begin on 10th March, 2010 and is expected to take about three years to complete. Completion is expected on 31st July, 2012 for the first lot of the Como bypass road and on 31st July, 2013 for the first lot of the Varese bypass road and the section from the A8 to the A9. The final designs will be coordinated with the designs of the remaining sections, which is programmed to be completed by the end of the year for approval scheduled for spring 2009. Visit www.pedemontana.com, www.impregilo.it and www.astaldi.com 20/08.Open invitation to tender, deadline 17th July, 2008 for construction checking of the final design of the Pedemontana highway connection between Dalmine, Como, Varese and Gaggiolo Pass and associated works. Click it/128. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=135863-2008, OJ S 101, or contact Austostrada Pedemontana Lombarda, Milan, fax +39 0267741256. E-mail posta@pedemontana.com 23/08.A consortium led by Technital teaming up with Idroesse Infrastrutture, Engineering and Technital Services (ETS), SPM Consulting, Girpa, Errevia and Proginvest scooped a EUR19.7 million contract to carry out the final design for sections B1, B2, C, D, the second lot of the Como orbital motorway, the second lot of Varese orbital motorway of the highway connection between Dalmine, Como, Varese and Gaggiolo Pass and associated works. This 87 km project, named Pedemontana highway, includes 40 kilometres of tunnel. Visit www.technital-spa.com, www.idroesse.com, www.spm-spa.it, www.girpa.it, www.errevia.com, www.proginvest.it and http://www.pedemontana.com 27/08.



Permalink

Restricted call for tenders, deadline 02.08.2010 for design and construction of B1, B2, C, D sections and associated works of the motorway connection between Dalmine, Como, Varese and Gaggiolo. Contract value EUR2.25-2.35 billion, duration 2,180 days. Contact Autostrada Pedemontana Lombarda SpA , attn Giuliano Lorenzi, Milan, tel +39 02677412-1, fax -56, e-mail posta@pedemontana.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=159330-2010 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=183313-2010. 30/10



Permalink

The JV Strabag/Grandi Lavori Fincosit/Impresa Costruzioni Giuseppe Maltauro/Adanti has been awarded the EUR1.68bn contract, VAT not included, for design and construction of B1, B2, C, D sections and associated works of the motorway connection between Dalmine, Como, Varese and Gaggiolo. Contact Autostrada Pedemontana Lombarda SpA, attn Eng. Giuliano Lorenzi, Milano, tel +39 026774121, fax +39 0267741256, e-mail posta@pedemontana.com. Visit

http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=409016-2011. 02/12.



Permalink

JV Conteco/Rina Check/No Gap Controls (Milano) has been awarded the EUR540,735 contract, VAT not included, for civil engineering consultancy services concerning validation of design of  B1, B2, C, D sections and associated works of the motorway connection between Dalmine, Como, Varese and Gaggiolo. Contact Autostrada Pedemontana Lombarda SpA, attn Eng. Giuliano Lorenzi, Milano, tel +39 026774121, fax +39 0267741256, e-mail posta@pedemontana.com. Visit

http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=141210-2012. 19/12.



Permalink

Open invitation to tender, deadline 29.06.2012, for general management and safety coordination during construction of B1, B2, C, D sections and associated works of the motorway connection between Dalmine, Como, Varese and Gaggiolo. Contract value EUR54.7 million, duration 1,640 days. Time limit for requests for documents is 15.06.2012. Contact Autostrada Pedemontana Lombarda SpA , attn Giuliano Lorenzi, Milan, tel +39 02677412-1, fax -56, e-mail posta@pedemontana.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=150764-2012. 20/12.



Permalink

Autostrada Pedemontana Lombarda SpA invites expressions of interest, deadline 16.06.2015, to identify which credit institutions to invite to the selection procedure through multiple direct invitations, for the award of a medium/long term loan agreement, maximum EUR2.95 billion value, and for EUR200 million guarantee facility, earmarked to the release of the sureties pursuant for the proper execution of the works or proper performance of the operations covered by the Pedemontana Lombarda Motorway concession. Contact Autostrada Pedemontana Lombarda SpA, Assago, e-mail pedemontana@pec.it. Visit http://www.pedemontana.com/Binary/UFFICI/GARE_E_CONTRATTI/2015-05-FINANZIAMENTO_SENIOR/PUBLIC_NOTICE_TO_ACQUIRE_EXPRESSIONS_OF_INTEREST.pdf. 20/15.



Permalink

Autostrada Pedemontana Lombarda S.p.A. (APL) is inviting expressions of interest, deadline 30.11.2018, for design, construction and management of the Dalmine, Como, Varese, Gaggiolo pass connection and its ancillary works. Expressions of interest must be sent to APL, email pedemontana@pec.it. Visit http://www.pedemontana.com/Binary/UFFICI/GARE_E_CONTRATTI/AVVISI_POST_INFORMAZIONE/2018.10.11-CONSULTAZIONE_PRELIMINARE/Avviso_di_consultazione_preliminare_di_mercato.pdf

and

http://www.pedemontana.com/Binary/UFFICI/GARE_E_CONTRATTI/AVVISI_POST_INFORMAZIONE/2018.10.11-CONSULTAZIONE_PRELIMINARE/AVVISO_RETTIFICATO.pdf.

41/18.



Permalink

11 Joint ventures or companies sent their expressions of interest for design, construction and management of the Dalmine, Como, Varese, Gaggiolo pass connection and its ancillary works.  Visit http://www.pedemontana.com/Binary/UFFICI/COMUNICAZIONE/COMUNICATI_STAMPA/APL_-_Comunicato_Stampa_03.12.2018.pdf.

49/18.



Permalink


Restricted invitation to tender, deadline 05/06/20, for the design and build sections B2 (12.7 km between Lentate sul Seveso and Cesano Maderno) and C (20 km between Cesano Maderno and Milan’s A51 eastern by-pass) of the new Pedemontana Lombarda highway. Value of the contract EUR1,43 million, excluding VAT.  Duration of the  contract 1350 days. Contact Autostrada Pedemontana Lombarda SpA, attn Eng. Giuseppe Sambo, Assago (MI), tel  +39 026774121, fax +39 0267741256, email pedemontana@pec.it. For further information on the tender, please click here and here. Ref.n. CIG 8228236B24. 20/20. 

 




Permalink


The consortium Webuild, along with Astaldi (70%)/Pizzarotti (30%) has been selected as the best bidder for a €1.26-billion contract. The contract is to design and build sections B2 (12.7 km between Lentate sul Seveso and Cesano Maderno, with a 2.5 km cut&cover tunnel) and C (20 km between Cesano Maderno and Milan’s A51 eastern by-pass, with a 6.5 km cut&cover tunnel). This project is part of the new Pedemontana Lombarda highway. Contact Autostrada Pedemontana Lombarda SpA, attn Eng. Giuseppe Sambo, Assago (MI), tel  +39 026774121, fax +39 0267741256, email pedemontana@pec.it. Visit https://www.webuildgroup.com/en and https://www.pizzarotti.it/. Ref.n. CIG 8228236B24. 09/21.



Permalink


Open invitation to tender, deadline 25/03/2021, for ordinary maintenance, emergency and SOS services after vehicular accidents, for environmental services, for extraordinary maintenance works and the necessary supplies  on the  A36 - A59 - A60 and ex SS 35 Lentate Bypass and other roads of Autostrada Pedemontana Lombarda SPA. Value of the contract is EUR5,51 million, excluding VAT.  Duration of the contract 1095 days. Contact Autostrada Pedemontana Lombarda SpA, Assago (MI), tel  +39 026774121, fax +39 0267741256, email pedemontana@pec.it. For further information on the tender, please click here and here. Ref.n. CIG 8631560CA2. 09/21. 




Permalink