Italy, Campania-Molise - it/114

Hydropower

Open call for bids, deadline 23rd February, 2006 for completion of the Pavoncelli bis hydropower tunnel between the regions of Campania and Molise. The main underground structures to be constructed are as follows: shaft A (12.5 m of diameter and 20 m of depth), Rosalba bis tunnel (section Unití  Irpine, 174.7 m), Vallone Acqua delle Brecce cut-and-cover tunnel, surge tank, Pavoncelli bis tunnel stretch in limestone (90 m), Pavoncelli bis tunnel sections in flysch (1,487.3 m and 2,208.2 m), and Pavoncelli bis tunnel section in clay (4,011 m).The main underground structures to be completed are: Rosalba bis tunnel portion (86.4 m), Pavoncelli bis tunnel section in limestone (304.8 m), Pavoncelli bis tunnel section flooded (200 m), Pavoncelli bis tunnel section in flysch (139.4 m), Pavoncelli bis tunnel section in clay (967.4 m), review of the final section of the Pavoncelli bis tunnel (746.4 m), and shaft C. Tender value: EUR115.6 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=01043-2006, OJ S 1, or contact Ministry for infrastructure and transport, Rome, fax +39 0644267533. E-mail sabatelli.commpav@infrastrutturetrasporti.it 05/06.Open call for tenders, deadline 1st June, 2006 for construction management and security coordination for the completion of the Caposele-Conza water tunnel, including completion and upgrading of approx. 2,450 metres of existing tunnels, construction of approx. 8 km of new tunnels, an hydropower plant and external ancillary structures. Click it/114. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=080204-2006, OJ S 76, or contact Commissario Straordinario per la galleria Pavoncelli bis, Rome, fax +39 0644267533. E-mail sabatelli.commpav@infrastrutturetrasporti.it 19/06.Condotte is the leader of a JV, including SELI, Faver and DEC, that secured a EUR106.7 million contract for executive design and construction works to complete the Pavoncelli bis water tunnel between the regions of Campania and Molise, as part of the Sele Calore aqueduct. Click it/114 for details. Visit www.condotte.com and www.selitunnel.com 38/06.



Permalink

Faver Spa (Bari) secured the EUR10.8 million contract for the technical monitoring, emergency works, maintenance and failure works for the main system aqueduct, and also refurbishment works of some stretches of Pavoncelli tunnel, belonging at Aqueduct Sele-Calore. Lot Centro Nord. Contact Alessio Alfonso Chimenti, Acquedotto Pugliese Spa, Bari, tel +39 0805723491, fax +39 0805723018, e-mail segreteria@acquisti.aqp.it. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=334516-2009 and www.faver.net. 51/09.



Permalink

Prior information notice for tender to construct a 10 km-long, 3.5 m-diameter parallel tunnel with 200 m-long connections to century-old Pavoncelli water tunnel in municipalities of Caposele, Theory and Conza della Campania as part of new Acquedotto Pugliese. Existing tunnel in limestone, flysch and clay-shales was severely damaged in 1980 Irpinia earthquake. Estimated duration of contract 1,825 days, value EUR100-150 million. Further information from Ing Michele Paradiso at Commissario Delegado in Bari, tel +39 0805-968263, fax -563888, e-mail pavoncelli@gmail.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=099161-2010. 14/10.



Permalink

Prior information notice for tender to construct a 10 km-long, 3.5 m-diameter parallel tunnel with 200 m-long connections to century-old Pavoncelli water tunnel in municipalities of Caposele, Theory and Conza della Campania as part of new Acquedotto Pugliese. Existing tunnel in limestone, flysch and clay-shales was severely damaged in 1980 Irpinia earthquake. Latest estimated duration of contract 1,645 days, value EUR117,359,719 excluding VAT. Project profile at https://sites.google.com/site/pavoncellisbis. Further information from Ing Michele Paradiso at Commissario Delegado in Bari, tel +39 0805-968263, fax -563888, e-mail pavoncelli@gmail.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=163577-2011. 21/11.



Permalink

Open invitation to tender, deadline 08.09.2011, for construction of a 10 km-long, 3.5 m-diameter parallel tunnel with 200 m-long connections to century-old Pavoncelli water tunnel in municipalities of Caposele, Theory and Conza della Campania as part of new Acquedotto Pugliese. Existing tunnel in limestone, flysch and clay-shales was severely damaged in 1980 Irpinia earthquake. Latest estimated duration of contract 1,645 days, value EUR117,359,719 excluding VAT. Time limit for receipt of requests for documents or for accessing documents 15.07.2011. Project profile at https://sites.google.com/site/pavoncellisbis. Further information from Ing Michele Paradiso at Commissario Delegado in Bari, tel +39 0805-968263, fax -563888, e-mail pavoncelli@gmail.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=175122-2011. 23/11.



Permalink

Award of contract value EUR110,980,515 excluding VAT to ATI Vianini Lavori of Roma, tel +39 06374922-42, fax –06, e-mail gare@vianinigroup.it, for construction of a 10 km-long, 3.5 m-diameter parallel tunnel with 200 m-long connections to century-old Pavoncelli water tunnel in municipalities of Caposele, Theory and Conza della Campania as part of new Acquedotto Pugliese. Existing tunnel in limestone, flysch and clay-shales was severely damaged in 1980 Irpinia earthquake. Further information from Ing Michele Paradiso at Commissario Delegado in Bari, tel +39 0805-968263, fax –563888, e-mail pavoncelli@gmail.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=139186-2012. 18/12.