Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Austria

Austria, Styria - at/62

Motorway

Restricted procedure, deadline 13th January, 2004 for engineering during planning (2004-2005) and construction (2005-2008) for the Brucker motorway S 35, section north Stausee Zlatten-Mautstatt. Total length is 6.8 km, whereof two twin-tube tunnels in Kirchdorf and Kaltenbach (2,730 m and 1,088 m). Estimated construction cost is €142.4 million, whereof €98.4 million for tunnelling. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=214863-2003, OJ S 241, or contact í–sterreichische Autobahnen- und SchnellstraíŸen, Vienna, fax +43 15313414020. E-mail office.wien@oesag.at. Visit www.asfinag.at 02/04.Restricted procedure, deadline 27th January, 2004 for engineering design services for the Kirchdorf and Kaltenbach twin-tube tunnels (2,730 m and 1,088 m) on section north Stausee Zlatten-Mautstatt of the Brucker motorway S 35. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=221066-2003, OJ S 248, or contact í–sterreichische Autobahnen- und SchnellstraíŸen, Vienna, fax +43 15313414020. E-mail office.wien@oesag.at. Visit www.asfinag.at 02/04.Preinformation notice for construction of the 2 x 2.7 km Kirchdorf tunnel. Work start in May 2005. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=221736-2003, OJ S 249, or contact í–sterreichische Autobahnen- und SchnellstraíŸen, Vienna, fax +43 15313414020. E-mail office.wien@oesag.at 02/04.Preinformation notice for construction of the 2 x 1,088 m Kaltenbach tunnel on section north Stausee Zlatten-Mautstatt of the Brucker motorway S 35. Work start in October 2005. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=222570-2003, OJ S 250, or contact OESAG, Vienna, fax +43 15313414020. E-mail office.wien@oesag.at 03/04.Open call for tenders, deadline 21st September, 2005 for construction of 537 m of open air section and two tunnels on the Brucker expressway S 35: Kirchdorf (2,807 m / 2,653 m) and Kaltenbach (1,165 m / 1,011 m). Each tunnel will carry two lanes. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=149652-2005, OJ S 150, or contact ASFINAG, Vienna, fax +43 5010814020. E-mail baumanagement@asfinag.at 35/05.Restricted procedure, deadline 4th October, 2005 for geotechnical measurements, tunnel plans, control measurements and auditing during construction of the Kirchdorf tunnel (2,807 m / 2,653 m) and Kaltenbach tunnel (1,165 m / 1,011 m), on the Brucker expressway S 35. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=167459-2005, OJ S 168, or contact ASFINAG, Vienna, fax +43 5010814420. E-mail baumanagement@asfinag.at 37/05.Restricted procedure, deadline 24th October, 2005 for geological and hydrogeological services and geological engineering during construction of the Brucker expressway S 35, north section, which includes the Kirchdorf tunnel (2,807 m / 2,653 m) and Kaltenbach tunnel (1,165 m / 1,011 m). Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=179259-2005, OJ S 181, or contact ASFINAG, Vienna, fax +43 5010814320. E-mail baumanagement@asfinag.at 39/05.The call for tenders invited in August 2005 for construction of the Kirchdorf and Kaltenbach twin bored tunnels and a 537 m open air road section on the Brucker expressway S 35 has been cancelled. The Kirchdorf tunnel is 2,807 m and 2,653 m long. The Kaltenbach tunnel is 1,165 m and 1,011 m long. Each will carry two lanes per tube. Click at/62. 06/06.Open call for tenders, deadline 4th May, 2006 for construction of the Kirchdorf and Kaltenbach tunnels (contract 22), on the S 35 Brucker expressway. They are twin-tube tunnels, with lengths of 2,807 m and 2,653 m for the Kirchdorf tunnel and 1,165 m and 1,011 m for the Kaltenbach tunnel. Out of the total length of 7,636 m, 537 metres will be buit in cut and cover. Two lanes per tube, except in an expanded section of 166 metres that will carry three lanes. This is a re-bid. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=068519-2006, OJ S 66, or contact ASFINAG, Vienna, fax +43 5010814020. E-mail baumanagement@asfinag.at 15/06.Open call for tenders, deadline 15th April, 2008 for delivery, assembly and commissioning of electromechanical equipment in the 2 x 1,150 m Kaltenbach and the 2 x 2,800 m Kirchdorf tunnels. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=52031-2008, OJ S 38, or contact ASFINAG, Vienna, fax +43 5010814420. E-mail baumanagement@asfinag.at 09/08.Open call for bids, deadline 15th April, 2008 for delivery and assembly of the traffic systems and other equipment for the 2 x 1,150 m Kaltenbach and the 2 x 2,800 m Kirchdorf tunnels (video, emergency call, etc.). Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=53513-2008, OJ S 39, or contact ASFINAG, Vienna, fax +43 5010814420. E-mail baumanagement@asfinag.at 10/08.Open invitation to tender, deadline 24th June, 2008 for supply and installation of radio equipment in the 2 x 1,150 m Kaltenbach tunnel and the 2 x 2.8 km Kirchdorf tunnel on the Zlatten Stausee-Mautstatt section of the S 35 Brucker expressway. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=118367-2008, OJ S 87, or contact ASFINAG, Vienna, fax +43 5018814420. E-mail baumanagement@asfinag.at 20/08.Open invitation to tender, deadline 10th July, 2008 delivery and assembly of the medium voltage supply for the Kaltenbach and Kirchdorf tunnels, respectively 2 x 1,150 m long and 2 x 2,800 m long, on the Stausee Zkatten-Maustatt section of expressway S 35. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=131722-2008, OJ S 98, or contact Asfinag, Vienna, fax +43 5010814420. E-mail baumanagement@asfinag.at 22/08.Open invitation to tender, deadline 10th July, 2008 for delivery and assembly of fire protection doors for the 2 x 1,150 m Kaltenbach tunnel and the 2 x 2,800 m Kirchdorf tunnel. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=134274-2008, OJ S 100, or contact Asfinag, Vienna, fax +43 50108144. E-mail baumanagement@asfinag.at 23/08.Open invitation to tender, deadline 26th August, 2008 for delivery, assembly, commissioning and maintenance of jet fans in the Kaltenbach and Kirchdorf tunnels, respectively 2 x 1,150 m and 2 x 2,800 m in length, on the Stausee Zlatten-Maustatt section of expressway S 35. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=174405-2008, OJ S 131, or contact Asfinag, Vienna, fax +43 5010814420. E-mail baumanagement@asfinag.at 29/08.



Permalink

IDS Beratende Ingenieure GmbH Ingenieurburo fur Elektrotechnik und Maschinenbau from Schwaz secured the EUR495,307.05 contract, excluding VAT, for the tunnel risk analyses on the motorway A02 South, A09, S06 and S35, as RVS 09.03.11 guideline. Contact Asfinag, Eng. Markus Gutjahr, Vienna, tel  +43 6646010814555, fax +43 50108-14232, email markus.gutjahr@asfinag.at. For bid documents click here.

Ref. 2019/PROVIA ID-N.35781. 39/19.



Permalink


Open invitation to tender, deadline 30/08/2021, for the repair project of the Pack tunnels - Assingberg (254 m), Herzogberg (2007 m, 1956 m), Mitterberg (1142 m, 1134 m) and Kalcherkogel (1993 m, 1968 m) - on the A02 South motorway  between km 205,000 and km 231,000. For tender documents, please click here. Duration of the contract is from 01/10/2021 to 30/06/2026. Contact Asfinag  Bau Management GmbH, attn Roland Sticker, Vienna,  tel. +43 50108-14223, fax +43 50108-14222, email roland.sticker@asfinag.at.  Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=387925-2021. Ref.n. 2021/PROVIA ID-n.68278. 31/21. 




Permalink


The Joint Venture IKK Engineering GmbH from Graz and ste.p ZT GmbH from Vienna secured the EUR 585,550 contract, excluding VAT, for the repair project to the Pack tunnels - Assingberg (254 m), Herzogberg (2007 m, 1956 m), Mitterberg (1142 m, 1134 m) and Kalcherkogel (1993 m, 1968 m) - on A02 South motorway  between km 205,000 and km 231,000. Contact Asfinag  Bau Management GmbH, attn Roland Sticker, Vienna,  tel. +43 50108-14223, fax +43 50108-14222, email roland.sticker@asfinag.at.  Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=614151-2021. Ref.n. 2021/PROVIA ID-n.68278. 48/21. 



Permalink

Open invitation to tender, deadline 13/04/2022, for 2022-2026 maintenance of the E&M equipment  in the Kaltenbach ( (1011 m / 1165 m), Kirchdorf (2653 m / 2807 m) and Mixnitz (725 m) tunnels on the S35Brucker. Contact Asfinag, Vienna, fax +43 5010814420. E-mail baumanagement@asfinag.at.Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=175351-2022,  http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=130678-2022 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=069055-2022. Ref. n. 2022/PROVIA ID-N.76795. 14/22.



Permalink


Open invitation to tender, deadline 05/03/2024, for local construction supervision during the repair of the Pack tunnels and of the Assingberg (254 m) tunnel on the A02 South motorway  (km.205,089 - km 205,332 and  km 220,957 - km 230,987). Click here for bid/tender documents and where tenders must be sent. Duration of the contract is from 02/04/2024 to 30/06/2030. Contact Asfinag  Bau Management GmbH, attn Manfred Pech, Vienna,  tel. +43 6646010814226, email manfred.pech@asfinag.at.  Visit https://ted.europa.eu/en/notice/-/detail/75481-2024. Ref.Provia n. 111587. 06/24.




Permalink