Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Austria

Austria, Innsbruck-Kufstein - at/48

Radfeld/Wiesing - High Speed Railway

  Preinformation notice for construction of the double-track Radfeld-Wiesing tunnel, 4.3 km in length, on the Innsbruck-Kufstein rail link in Unterintal, Tyrol. TBM and conventional excavation. Also construction of a start shaft. Work to start in November 2003. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=028397-2003, OJ S 34, or contact Brenner Eisenbahn, Innsbruck, fax +43 512 5309110. E-mail Hans Lindenberger or Christian Nemec bw@beg.co.at 09/03.Preinformation notice for execution of the geological documents for the double-track Radfeld-Wiesing tunnel. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=028645-2003, OJ S 34, or contact Brenner Eisenbahn, Innsbruck, fax +43 512 5309110. E-mail Hans Lindenberger or Christian Nemec bw@beg.co.at 09/03.Preinformation notice for geotechnical measurements for the double-track Radfeld-Wiesing tunnel. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=028648-2003, OJ S 34, or contact Brenner Eisenbahn, Innsbruck, fax +43 512 5309110. E-mail Hans Lindenberger or Christian Nemec bw@beg.co.at 09/03.Preinformation notice for construction management and work control of the double-track Radfeld-Wiesing tunnel. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=028667-2003, OJ S 34, or contact Brenner Eisenbahn, Innsbruck, fax +43 512 5309110. E-mail Hans Lindenberger or Christian Nemec bw@beg.co.at 09/03. Open call for tenders, deadline 15th December, 2003 for construction of a 3,450 m-long north section of the 11,387 m Radfeld-Wiesing double-track tunnel and rescue galleries (570 m) in Inn valley, using conventional tunnelling methods. Also includes interior fittings for the main tunnel (4.2 km) and rescue tunnel (3.1 km). Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=188131-2003, OJ S 209, or contact Brenner Eisenbahn, Innsbruck, fax +43 5125309110. E-mail bw@beg.co.at 45/03.Open call for bids, deadline 17th December, 2003 for geotechnical measurements for a 4.3 km section of the 11,387 m Radfeld-Wiesing double-track tunnel as well as rescue tunnel running parallel to it. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=189418-2003, OJ S 210, or contact Brenner Eisenbahn, Innsbruck, fax +43 5125309110. E-mail bw@beg.co.at 45/03.Open call for bids, deadline 16th December, 2003 for construction supervision of a 4.3 km section of the 11,387 m Radfeld-Wiesing double-track tunnel and rescue tunnel running parallel to it. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=189516-2003, OJ S 210, or contact Brenner Eisenbahn, Innsbruck, fax +43 5125309110. E-mail bw@beg.co.at 45/03.Brenner Eisenbahn GmbH has commissioned the construction of the 3.5 km Brixlegg tunnel segment on the new Unterinntal line between Innsbruck and Kufstein to a JV between Porr and Bilfinger Berger for EUR64 million. Construction will last 20 months. Visit www.beg.co.at, www.porr.at and www.bilfinger.de 23/04.ILF and H. Voessing won a EUR1.6 million contract for construction management of the 4.3 km Radfeld/Brixlegg section of the 11.4 km double-track Radfeld/Wiesing tunnel as well as the parallel rescue tunnel and start shaft. Visit www.beg.co.at, www.ilf.com and www.voessing.de 23/04.Geodata ZT won a EUR784,270 contract for geotechnical measurements for a 4.3 km section of the 11,387 m Radfeld-Wiesing double-track tunnel as well as a rescue tunnel running parallel to it. Visit www.geodata.at 24/04.



Permalink

Negotiated invitation to tender, deadline 07.09.2015, for equipment maintenance in tunnels on the new railways Vienna-St. Polten, Innsbruck-Kufstein in Unterintal and Koralm. The contract is composed of six lots of duration 01.01.2016 to 31.12.2018, with a optional extension to 31.12.2020. Contact OEBB-Infrastruktur AG, represented by OEBB Business Competence Center GmbH, att.n Florian Fuehrer, Vienna, tel +43 19300032927, e-mail florian.fuehrer@oebb.at. For electronic access www.oebb.at/m2c. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=291490-2015. Ref.n. 2015/M2C ID-N.3723. 34/15.



Permalink