Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Austria

Austria, Linz - at/31

Highway

Neumarkt tunnel with length 1.3 km and cross-section 70 sq m to be bid in 2001. Construction by NATM techniques using drill/blast, rockbolts and shotcrete. In design by Laabmayr & Partner for completion 2003 at value $17.5 million. Enquire at laabmayr-sbg@aon.at October 2000.Open invitation to tender for construction of 3 km-long Neumarkt tunnel, deadline 22nd June, 2001. Contact BSV, Linz, fax +43 722 987 80522. Enquire at laabmayr-sbg@aon.at 22/01.Restricted call for bids, deadline 14th September, 2005 for project management during the design phase (2006-2009) of the west orbital motorway A26 in Linz. The 8,350 m project includes tunnels on each bank of the Danube and a bridge across the river. The south tunnel is 3.2 km and the north tunnel is 2.8 km in length. Read E-News Weekly 30/2004. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=154275-2005, OJ S 154, or contact ASFINAG, Vienna, fax +43 5010814320. E-mail baumanagement@asfinag.at 36/05.Restricted call for bids, deadline 25th October, 2005 for environmental coordination during the design phase (2006-2009) of the west orbital motorway A26 in Linz. The 8,350 m connection includes two tunnels (3.2 km and 2.8 km) on each bank of the Danube. Read E-News Weekly 30/2004. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=179264-2005, OJ S 181, or contact ASFINAG, Vienna, fax +43 5010814320. E-mail baumanagement@asfinag.at 39/05.Restricted call for tenders, deadline 27th January, 2006 for design of the south and north sections of the west orbital highway A 26 in Linz (approx. 8,350 m), a dual carriageway including tunnel designs (south tunnel of approx. 3,200 m and north tunnel of approx. 2,800 m). Read E-News Weekly 30/2004. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=242934-2005, OJ S 246, or contact ASFINAG, Vienna, fax +43 5010814420. E-mail baumanagement@asfinag.at 02/06.A JV formed by ILF, Retter + Partner and Kirsch Muchitsch & Partner received a EUR2.4 million contract to design the south and north sections of the west orbital highway A 26 in Linz (approx. 8,350 m), a dual carriageway including tunnel designs (south tunnel of approx. 3,200 m and north tunnel of approx. 2,800 m). Visit www.ilf.com, www.ib-retter.at and www.kmp.co.at 48/06.Restricted call for bids, deadline 19th February, 2007 for geology and soil mechanics for the west ring road A26 in Linz. The project begins at Bindermichl, then follows the west railway, runs in tunnel until the fourth Danube bridge, and continues, still in tunnel, on the opposite bank ending by a connection with the A7. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=11420-2007, OJ S 10, or contact ASFINAG, Vienna, fax +43 5010814420. E-mail baumanagement@asfinag.at 04/07.Open call for tenders, deadline 21st June, 2007 for planning of the E&M and safety equipment for the south section of Linz's west ring road A 26. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=112101-2007, OJ S 91, or contact ASFINAG, Vienna, fax +43 5010814420. E-mail baumanagement@asfinag.at. Click at/31. 20/07.BGG Consult and ESW Consulting scooped a EUR241,400 contract for geology and soil mechanics for the west ring road A26 in Linz. The project begins at Bindermichl, then follows the west railway, runs in tunnel until the fourth Danube bridge, and continues, still in tunnel, on the opposite bank ending by a connection with the A7. Visit www.bgg.at and www.wruss.at 52/07-01/08.



Permalink

Prior information notice of invitation to tender for the construction of the A26 ring road of Linz (Phase 1), linking the A7 Linz Hummelhof interchange with the B127 Rohrbacherstrasse. The new highway will be 4.7 km-long with 4 km in tunnel. Contact ASFINAG Bau Management GmbH, attn Klaus Mittermayr, Vienna, tel +43 5010814453, fax +43 5010814120, e-mail klaus.mittermayr@asfinag.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=028952-2015. Ref.n. L-564572-5121. 05/15.



Permalink

Prior information notice of invitation to tender for geotechnical and tunnelling services for the construction of the A26 ring road of Linz (Phase 1), linking the A7 Linz Hummelhof interchange with the B127 Rohrbacherstrasse. The new highway will be 4.7 km-long with 4 km in tunnel. Contact ASFINAG Bau Management GmbH, attn Klaus Mittermayr, Vienna, tel +43 5010814453, fax +43 5010814120, e-mail klaus.mittermayr@asfinag.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=028933-2015. Ref.n. L-564573-5121. 05/15.



Permalink

Prior information notice of invitation to tender for general management during construction of the A26 ring road of Linz (Phase 1), linking the A7 Linz Hummelhof interchange with the B127 Rohrbacherstrasse. The new highway will be 4.7 km-long with 4 km in tunnel. Contact ASFINAG Bau Management GmbH, attn Klaus Mittermayr, Vienna, tel +43 5010814453, fax +43 5010814120, e-mail klaus.mittermayr@asfinag.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=028932-2015. Ref.n. L-564570-5121. 05/15.



Permalink

Prior information notice of invitation to test E&M equipment on A26 ring road of Linz (Phase 1), linking the A7 Linz Hummelhof interchange with the B127 Rohrbacherstrasse. The new highway will be 4.7 km-long with 4 km in tunnel. Contact ASFINAG Bau Management GmbH, attn Eng. Robert Pany, Vienna, tel +43 5010814544, fax +43 5010814362, e-mail robert.pany@asfinag.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=028930-2015. Ref.n. L-564574-5121. 05/15.



Permalink

Prior information notice of invitation for general management about E&M, ventilation and other equipment on A26 ring road of Linz (Phase 1), linking the A7 Linz Hummelhof interchange with the B127 Rohrbacherstrasse. The new highway will be 4.7 km-long with 4 km in tunnel. Contact ASFINAG Bau Management GmbH, attn Eng. Robert Pany, Vienna, tel +43 5010814544, fax +43 5010814362, e-mail robert.pany@asfinag.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=028919-2015. Ref.n. L-564571-5121. 05/15.



Permalink


Ingenieurbüro. ste.p ZT GmbH from Vienna secured the geotechnical and tunnelling services for the construction of the A26 ring road of Linz (Phase 1), linking the A7 Linz Hummelhof interchange with the B127 Rohrbacherstrasse. The new highway will be 4.7 km-long with 4 km long tunnel. Contact ASFINAG Bau Management GmbH, attn Mrs Renate Schmiedmaier, Vienna, tel +43 5010814453, fax +43 5010814120, e-mail renate.schmiedmaier@asfinag.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=357903-2015. Ref.n. L-564573-5121. 42/15.





Permalink


Postponed from 20.10.2015 to 27.10.2015, the deadline of the open invitation to tender for general management during construction of the A26 ring road of Linz (Phase 1), linking the A7 Linz Hummelhof interchange with the B127 Rohrbacherstrasse. The new highway will be 4.7 km-long with 4 km in tunnel. Contact ASFINAG Bau Management GmbH, att.n Franz Sempelman, Vienna, tel +43 5010814458, fax +43 5010814452, e-mail franz.sempelmann@asfinag.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=296907-2015 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=361317-2015. Ref.n. L-564570-5121. 42/15.




Permalink


Dr. Hugo Kofler Ziviltechnikerkanzlei from Pernegg an der Murfor secured the contract for the construction of the A26 ring road in Linz (Phase 1), linking the A7 Linz Hummelhof interchange with the B127 Rohrbacherstrasse. The new highway will be 4.7 km-long with a 4 km long tunnel. Contact ASFINAG Bau Management GmbH, attn Nicole Dobretsberger, Vienna, tel +43 5010814450, fax +43 5010814120, e-mail nicole.dobretsberger@asfinag.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=124584-2016. Ref.n. L-564572-5121. 15/16. 




Permalink

Prior information notice of invitation for the construction of  ramps in the tunnel connecting with the Stahlhange bridge (Donau) on the A26 ring road in Linz (Phase 1), linking the A7 Linz Hummelhof interchange with the B127 Rohrbacherstrasse. Contact ASFINAG Bau Management GmbH, attn Eng. Franz Sempelmann, Vienna, tel +43 5010814450, fax +43 5010814120, e-mail nicole.dobretsberger@asfinag.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=378289-2017. Ref.n. L-632109-7920. 39/17.



Permalink

Prior information notice of invitation for planning services for tunnel ventilation on the A26 Linz Motorway, Section 2, from Waldeggstrasse to Donau-Sud including the 3.2km Freinberg tunnel. Contact Asfinag Bau Management GmbH, Vienna, tel +43 50108-14545, fax +43 50108-14362, e-mail ingrid.ellmer@asfinag.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=195468-2018 .Ref.n L-648248-854. 19/18.



Permalink

Open invitation to tender, deadline 13.02.2019, for planning services for construction of the 3.2km Freinberg tunnel on the A26 Linz Highway, Section 2, from Waldeggstrasse to Donau-Sud. Contact Asfinag Bau Management GmbH, attn. Eng. Klaus Mittermayr, Vienna, tel +43 5010814453,

fax +43 5010814452, email klaus.mittermayr@asfinag.at. Visit

http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=56419-2019,

http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=526394-2018,

http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=446281-2018

and

http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=353607-2018.

Ref. 2018/PROVIA n.15729. 06/19.




Permalink

The JV IGT Geotechnik und Tunnelbau ZT GmbH/IL – Ingenieurbüro Laabmayr & Partner GesmbH from Salzburg secured the EUR1.28 million contract, excluding VAT, for planning services for construction of the 3.2km Freinberg tunnel on the A26 Linz Highway, Section 2, from Waldeggstrasse to Donau-Sud. Contact Asfinag Bau Management GmbH, Vienna, tel +43 50108-14453,  fax +43 50108-14452, email bmg.baubueroA26@asfinag.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=235614-2019.

Ref. 2018/PROVIA n.15729. 21/19.



Permalink

Open invitation to tender, deadline 17/09/2019, for construction static analysis of the 3.2km Freinberg tunnel on the A26 Linz Highway, Section 2, from Waldeggstrasse to Donau-Sud. For bid documents www.provia.at.

Duration of the contract is from 01/11/2019 to 30/12/2023. Contact Asfinag Bau Management GmbH, Vienna, tel +43 50108-14454,  fax +43 50108-14120, email bmg.baubueroA26@asfinag.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=388025-2019.

Ref. 2019/PROVIA n. 32576. 34/19.



Permalink

ILF Consulting Engineers Austria GmbH/ILF Consulting Engineers Austria GmbH from Rum bei Innsbruck secured the EUR244,047.50 contract for the construction static analysis of the 3.2km Freinberg tunnel on the A26 Linz Highway, Section 2, from Waldeggstrasse to Donau-Sud.

Contact Asfinag Bau Management GmbH, attn Klaus Mittermayr, Vienna, tel +43 50108-14453,  fax +43 50108-14120, email klaus.mittermayr@asfinag.at. For tender information please click here. Ref. 2019/PROVIA n. 32576. 05/20.



Permalink