The Land Transport Authority (LTA) in Singapore has invited members of the public to vote for their preferred names for three of the stations of the 4 km Circle Line 6. (CCL6): Keppel, Cantonment and Prince Edward. The station names were shortlisted from almost 2,000 suggestions received for the earlier station naming exercise conducted between 15.05.2017 and 18.06.2017. The shortlisted names were approved by the Street and Building Names Board (SBNB). So from the 10.11.2017 to the 10.12.2017 the public can vote for their preferred station names through http://www.lta.gov.sg. The CCL6 will close the loop for the CCL by connecting Harbour Front Station to Marina Bay Station. When the three CCL6 stations are completed in 2025, the CCL will have a total of 33 stations, including 12 interchange stations with other MRT lines. Click sg/15 for tunnelbuilder archive. 46/17.
19.03.2026 Bulgaria
19.03.2026 France
20.03.2026 Italy
20.03.2026 Germany
23.03.2026 France
24.03.2026 Romania
24.03.2026 Italy
30.03.2026 Italy
31.03.2026 Ireland
07.04.2026 Austria
09.04.2026 France
09.04.2026 Germany
14.04.2026 United States
23.04.2026 Sweden
24.04.2026 United Kingdom
27.04.2026 Switzerland
30.04.2026 Switzerland
30.04.2026 Sweden
04.05.2026 Slovakia
04.05.2026 Switzerland
04.06.2026 Switzerland