On 24.01.2015 the 4.9 km-long first lot of Varese orbital motorway opened between A8 interconnection at Gazzada Schianno and Vedano Olona near Varese municipality.
The stretch includes the 2.1 km-long rock tunnel in Morazzone and a 440 m cut/cover tunnel that connects the motorway with the existing Vedano viaduct.
The 14.6 km-long section A of Pedemontana Lombarda connecting the A8 (Cassano Magnano) and A9 (Lomazzo) motorways, and including the Solbiate Olona (685 m) and Gorla (1,270 m) cut/cover tunnels and the 475 m-long Solbiate Olona rock tunnel has also opened. Click here for some photos, here and it/128 for tunnelbuilder archive. Visit http://www.pedemontana.com/. 05/15.
07.04.2026 Austria
08.04.2026 Norway
09.04.2026 Germany
09.04.2026 France
14.04.2026 United States
23.04.2026 Sweden
24.04.2026 United Kingdom
24.04.2026 Switzerland
27.04.2026 Italy
27.04.2026 Switzerland
30.04.2026 Sweden
30.04.2026 Switzerland
04.05.2026 Slovakia
04.05.2026 Switzerland
21.05.2026 Bulgaria
04.06.2026 Switzerland
07.07.2026 Germany
31.12.2031 Germany