On 24.01.2015 the 4.9 km-long first lot of Varese orbital motorway opened between A8 interconnection at Gazzada Schianno and Vedano Olona near Varese municipality.
The stretch includes the 2.1 km-long rock tunnel in Morazzone and a 440 m cut/cover tunnel that connects the motorway with the existing Vedano viaduct.
The 14.6 km-long section A of Pedemontana Lombarda connecting the A8 (Cassano Magnano) and A9 (Lomazzo) motorways, and including the Solbiate Olona (685 m) and Gorla (1,270 m) cut/cover tunnels and the 475 m-long Solbiate Olona rock tunnel has also opened. Click here for some photos, here and it/128 for tunnelbuilder archive. Visit http://www.pedemontana.com/. 05/15.
17.03.2025 France
17.03.2025 Norway
19.03.2025 Germany
19.03.2025 Norway
21.03.2025 Spain
24.03.2025 Romania
24.03.2025 Greece
24.03.2025 Austria
24.03.2025 Croatia
26.03.2025 Finland
27.03.2025 Spain
28.03.2025 France
31.03.2025 Sweden
01.04.2025 Germany
01.04.2025 Poland
04.04.2025 Austria
07.04.2025 France
07.04.2025 Spain
08.04.2025 Netherlands
11.04.2025 Switzerland
14.04.2025 Switzerland
25.04.2025 Norway
16.05.2025 Switzerland