On 24.01.2015 the 4.9 km-long first lot of Varese orbital motorway opened between A8 interconnection at Gazzada Schianno and Vedano Olona near Varese municipality.
The stretch includes the 2.1 km-long rock tunnel in Morazzone and a 440 m cut/cover tunnel that connects the motorway with the existing Vedano viaduct.
The 14.6 km-long section A of Pedemontana Lombarda connecting the A8 (Cassano Magnano) and A9 (Lomazzo) motorways, and including the Solbiate Olona (685 m) and Gorla (1,270 m) cut/cover tunnels and the 475 m-long Solbiate Olona rock tunnel has also opened. Click here for some photos, here and it/128 for tunnelbuilder archive. Visit http://www.pedemontana.com/. 05/15.
21.04.2025 Sweden
22.04.2025 Sweden
22.04.2025 Germany
23.04.2025 Norway
23.04.2025 Germany
23.04.2025 Poland
24.04.2025 Poland
24.04.2025 Romania
25.04.2025 Poland
25.04.2025 Switzerland
25.04.2025 Norway
28.04.2025 Germany
28.04.2025 Austria
28.04.2025 France
30.04.2025 Austria
30.04.2025 India
02.05.2025 Germany
05.05.2025 Macedonia
06.05.2025 Germany
07.05.2025 Germany
09.05.2025 Germany
09.05.2025 Poland
09.05.2025 Switzerland
14.05.2025 Switzerland
14.05.2025 Poland
16.05.2025 Switzerland
16.05.2025 Italy
22.05.2025 Austria
23.05.2025 Switzerland
26.05.2025 Czech Republic
28.05.2025 Italy
05.06.2025 Iceland
27.06.2025 Switzerland