On 24.01.2015 the 4.9 km-long first lot of Varese orbital motorway opened between A8 interconnection at Gazzada Schianno and Vedano Olona near Varese municipality.
The stretch includes the 2.1 km-long rock tunnel in Morazzone and a 440 m cut/cover tunnel that connects the motorway with the existing Vedano viaduct.
The 14.6 km-long section A of Pedemontana Lombarda connecting the A8 (Cassano Magnano) and A9 (Lomazzo) motorways, and including the Solbiate Olona (685 m) and Gorla (1,270 m) cut/cover tunnels and the 475 m-long Solbiate Olona rock tunnel has also opened. Click here for some photos, here and it/128 for tunnelbuilder archive. Visit http://www.pedemontana.com/. 05/15.
29.08.2025 Denmark
01.09.2025 Brazil
01.09.2025 Switzerland
02.09.2025 Spain
02.09.2025 Macedonia
03.09.2025 Spain
11.09.2025 Switzerland
15.09.2025 Sweden
15.09.2025 Italy
22.09.2025 Netherlands
03.10.2025 Netherlands