On 24.01.2015 the 4.9 km-long first lot of Varese orbital motorway opened between A8 interconnection at Gazzada Schianno and Vedano Olona near Varese municipality.
The stretch includes the 2.1 km-long rock tunnel in Morazzone and a 440 m cut/cover tunnel that connects the motorway with the existing Vedano viaduct.
The 14.6 km-long section A of Pedemontana Lombarda connecting the A8 (Cassano Magnano) and A9 (Lomazzo) motorways, and including the Solbiate Olona (685 m) and Gorla (1,270 m) cut/cover tunnels and the 475 m-long Solbiate Olona rock tunnel has also opened. Click here for some photos, here and it/128 for tunnelbuilder archive. Visit http://www.pedemontana.com/. 05/15.
04.07.2025 Norway
09.07.2025 Spain
10.07.2025 Germany
15.07.2025 Spain
21.07.2025 Czech Republic
22.07.2025 France
28.07.2025 Austria
28.07.2025 Brazil
29.07.2025 Czech Republic
29.07.2025 Germany
31.07.2025 France
05.08.2025 Poland
11.08.2025 Switzerland
14.08.2025 Switzerland
14.08.2025 Italy
19.08.2025 Spain
01.09.2025 Brazil
01.09.2025 Switzerland
02.09.2025 Spain
15.09.2025 Sweden
15.09.2025 Italy