On 24.01.2015 the 4.9 km-long first lot of Varese orbital motorway opened between A8 interconnection at Gazzada Schianno and Vedano Olona near Varese municipality.
The stretch includes the 2.1 km-long rock tunnel in Morazzone and a 440 m cut/cover tunnel that connects the motorway with the existing Vedano viaduct.
The 14.6 km-long section A of Pedemontana Lombarda connecting the A8 (Cassano Magnano) and A9 (Lomazzo) motorways, and including the Solbiate Olona (685 m) and Gorla (1,270 m) cut/cover tunnels and the 475 m-long Solbiate Olona rock tunnel has also opened. Click here for some photos, here and it/128 for tunnelbuilder archive. Visit http://www.pedemontana.com/. 05/15.
09.05.2025 Germany
09.05.2025 Poland
09.05.2025 Switzerland
13.05.2025 Germany
14.05.2025 Switzerland
14.05.2025 Poland
16.05.2025 Switzerland
16.05.2025 Italy
22.05.2025 Austria
23.05.2025 Switzerland
26.05.2025 Czech Republic
26.05.2025 Norway
28.05.2025 Italy
02.06.2025 Spain
04.06.2025 Norway
04.06.2025 Austria
05.06.2025 Iceland
09.06.2025 Switzerland
16.06.2025 Spain
17.06.2025 Italy
17.06.2025 France
19.06.2025 France
19.06.2025 Italy
24.06.2025 Switzerland
27.06.2025 Switzerland
28.07.2025 Brazil