A new TELT TBM - 10.5 m diameter, 264 t weight, 180 m length, for the Lyon-Turin new line unveiled on October 6th, 2023 at the Herrenknecht AG plant! It will work on the CO6/7 site for the Mont Cenis base tunnel. For further information click here, fr/11 and it/80 . Visit https://www.telt.eu/en/. 40/23.
09.05.2025 Germany
09.05.2025 Poland
09.05.2025 Switzerland
13.05.2025 Germany
14.05.2025 Switzerland
14.05.2025 Poland
16.05.2025 Switzerland
16.05.2025 Italy
22.05.2025 Austria
23.05.2025 Switzerland
26.05.2025 Czech Republic
26.05.2025 Norway
28.05.2025 Italy
02.06.2025 Spain
04.06.2025 Norway
04.06.2025 Austria
05.06.2025 Iceland
09.06.2025 Switzerland
16.06.2025 Spain
17.06.2025 Italy
17.06.2025 France
19.06.2025 France
19.06.2025 Italy
24.06.2025 Switzerland
27.06.2025 Switzerland
28.07.2025 Brazil