On 07.10.2013 TBM Yorkie broke through the headwall at the extraction shaft located on Highway 7, west of Jane Street having completed 935 m of tunnel and placed 623 lining rings.
Companion TBM Torkie is in the parallel tunnel, which is just over 1,000 m-long with 686 lining rings. Click here and ca/30 for tunnelbuilder archive. Visit http://www.ttc.ca/Spadina/Project_News/Construction_News/News_by_Date/2013/October/07_Yorkie_Breakthrough_Hwy_7.jsp. 43/13.
15.07.2025 Spain
21.07.2025 Germany
21.07.2025 Czech Republic
22.07.2025 France
28.07.2025 Austria
28.07.2025 Brazil
29.07.2025 Czech Republic
29.07.2025 Germany
31.07.2025 France
05.08.2025 Poland
11.08.2025 Switzerland
12.08.2025 Czech Republic
14.08.2025 Italy
14.08.2025 Switzerland
19.08.2025 Spain
25.08.2025 France
26.08.2025 Switzerland
01.09.2025 Switzerland
01.09.2025 Brazil
02.09.2025 Spain
15.09.2025 Italy
15.09.2025 Sweden
22.09.2025 Netherlands