On 17/09/2021 the Weilan Tunnel part of the Guangxi Tianxi Expressway project invested in and constructed by Energy China Gezhouba Group successfully achieved a full-scale break through. The left side of Weilan Tunnel is 1,186 m long, and the right side is 1,225 m long.
Tianxi Expressway is an important part of the east-west expressway in Yunnan and Guangxi provinces (China) and the Guangxi Expressway Network Planning and Revision (2010-2020). After the project is completed, it will become another important expressway out of the Guangxi Zhuang Autonomous Region. Visit http://www.cggc.ceec.net.cn. 38/21.
06.02.2026 Spain
09.02.2026 Norway
13.02.2026 Italy
16.02.2026 Iceland
17.02.2026 France
19.02.2026 Sweden
23.02.2026 Denmark
23.02.2026 Switzerland
24.02.2026 Italy
19.03.2026 Bulgaria
24.03.2026 Italy
23.04.2026 Sweden
24.04.2026 United Kingdom
04.05.2026 Switzerland