On 17/09/2021 the Weilan Tunnel part of the Guangxi Tianxi Expressway project invested in and constructed by Energy China Gezhouba Group successfully achieved a full-scale break through. The left side of Weilan Tunnel is 1,186 m long, and the right side is 1,225 m long.
Tianxi Expressway is an important part of the east-west expressway in Yunnan and Guangxi provinces (China) and the Guangxi Expressway Network Planning and Revision (2010-2020). After the project is completed, it will become another important expressway out of the Guangxi Zhuang Autonomous Region. Visit http://www.cggc.ceec.net.cn. 38/21.
09.03.2026 Italy
11.03.2026 Italy
19.03.2026 Bulgaria
20.03.2026 Italy
23.03.2026 France
24.03.2026 Italy
30.03.2026 Italy
31.03.2026 Ireland
09.04.2026 Germany
23.04.2026 Sweden
24.04.2026 United Kingdom
30.04.2026 Sweden
30.04.2026 Switzerland
04.05.2026 Switzerland
04.06.2026 Switzerland