On the 11th of March 2019 the board of TELT, the Italian-French company building the tunnel for the Turin-Lyon high-speed rail link, approved the call for tenders for the tunnel, on the French side. The estimated value of the tenders is EUR2.3 billion.
The invitations to tender will contain the explicit right to stop the procedure at any stage without obligations. TELT also confirms its commitment to verify what the two Governments want at the end of the selection. This will be done before sending out the tender documents to the qualified companies. Click here, fr/11 and it/80 for the tunnelbuilder archive. Visit http://www.telt-sas.com. 11/19.
21.07.2025 Czech Republic
21.07.2025 Germany
22.07.2025 France
28.07.2025 Austria
28.07.2025 Brazil
29.07.2025 Czech Republic
29.07.2025 Germany
31.07.2025 France
05.08.2025 Poland
11.08.2025 Switzerland
12.08.2025 Czech Republic
14.08.2025 Italy
14.08.2025 Switzerland
19.08.2025 Spain
25.08.2025 France
26.08.2025 Switzerland
01.09.2025 Switzerland
01.09.2025 Brazil
02.09.2025 Spain
15.09.2025 Italy
15.09.2025 Sweden
22.09.2025 Netherlands