On the 11th of March 2019 the board of TELT, the Italian-French company building the tunnel for the Turin-Lyon high-speed rail link, approved the call for tenders for the tunnel, on the French side. The estimated value of the tenders is EUR2.3 billion.
The invitations to tender will contain the explicit right to stop the procedure at any stage without obligations. TELT also confirms its commitment to verify what the two Governments want at the end of the selection. This will be done before sending out the tender documents to the qualified companies. Click here, fr/11 and it/80 for the tunnelbuilder archive. Visit http://www.telt-sas.com. 11/19.
31.03.2025 Sweden
01.04.2025 Germany
01.04.2025 Poland
02.04.2025 Austria
04.04.2025 Austria
07.04.2025 France
07.04.2025 Germany
07.04.2025 Spain
08.04.2025 Netherlands
11.04.2025 Italy
11.04.2025 Switzerland
14.04.2025 Switzerland
14.04.2025 Austria
22.04.2025 Germany
22.04.2025 Sweden
23.04.2025 Norway
24.04.2025 Romania
25.04.2025 Poland
25.04.2025 Norway
25.04.2025 Switzerland
30.04.2025 Austria
06.05.2025 Germany
09.05.2025 Switzerland
14.05.2025 Switzerland
16.05.2025 Switzerland
27.06.2025 Switzerland