It’s a successful FAT for the TBM - 200 m long, 300 t weight and with a 7.08 m diameter - that will drive the 11.3km Rentvanns/Clear Water tunnel between Trosterud and Huseby for the NVO (Ny Vannforsyning Oslo/New Water Supply for Oslo), contract E6. The TBM will be now dismantled and shipped to Oslo.
The tunnel contract E6 - awarded to the Joint Venture AF Ghella - also includes access tunnels, pumping station and clean water basins at Trosterud and the tunnel section Oset-Disen (3 km) to be blasted; the laying of pipes in the clean water tunnel, and the establishment of a connection to the water distribution network. Click no/85 for tunnelbuilder archive. Visit https://www.oslo.kommune.no, https://www.ghella.com/en and https://afgruppen.no/. 28/23
09.07.2025 Spain
10.07.2025 Germany
15.07.2025 Spain
21.07.2025 Czech Republic
22.07.2025 France
28.07.2025 Austria
28.07.2025 Brazil
29.07.2025 Germany
29.07.2025 Czech Republic
31.07.2025 France
05.08.2025 Poland
11.08.2025 Switzerland
14.08.2025 Switzerland
14.08.2025 Italy
19.08.2025 Spain
01.09.2025 Brazil
01.09.2025 Switzerland
02.09.2025 Spain
15.09.2025 Sweden
15.09.2025 Italy