It’s a successful FAT for the TBM - 200 m long, 300 t weight and with a 7.08 m diameter - that will drive the 11.3km Rentvanns/Clear Water tunnel between Trosterud and Huseby for the NVO (Ny Vannforsyning Oslo/New Water Supply for Oslo), contract E6. The TBM will be now dismantled and shipped to Oslo.
The tunnel contract E6 - awarded to the Joint Venture AF Ghella - also includes access tunnels, pumping station and clean water basins at Trosterud and the tunnel section Oset-Disen (3 km) to be blasted; the laying of pipes in the clean water tunnel, and the establishment of a connection to the water distribution network. Click no/85 for tunnelbuilder archive. Visit https://www.oslo.kommune.no, https://www.ghella.com/en and https://afgruppen.no/. 28/23
03.12.2024 Austria
05.12.2024 France
05.12.2024 Germany
06.12.2024 United States
09.12.2024 France
09.12.2024 Austria
12.12.2024 Belgium
12.12.2024 Switzerland
13.12.2024 Germany
13.12.2024 Norway
15.12.2024 Austria
16.12.2024 Belgium
20.12.2024 Norway
23.12.2024 Spain
09.01.2025 Switzerland
15.01.2025 Romania
15.01.2025 Germany
17.01.2025 Spain
17.01.2025 Switzerland
20.01.2025 Switzerland
27.01.2025 Switzerland
10.02.2025 Switzerland
16.05.2025 Switzerland