The Fomento approved the public information document, the technical document of the project and the Environmental Impact Study for the northern bypass of Puertollano (Ciudad Real Province). The new 11,3 km route, through the municipalities of Argamasilla de Calatrava, Puertollano and Almodóvar del Campo, will be part of the future highway A 43 Extremadura - Valencia, and it will include a 1.7km twin tube tunnel from La Nava to Retamar, under the Sierra Decarada de la Santa. Initial investment will be EUR100.93 millions, including 21% VAT. The bypass will connect the A41 with the the N420. For further information visit http://www.fomento.gob.es/NR/rdonlyres/0d8328db-252b-4e23-b79c-79a463d5ed64/149448/18052302.pdf.21/18.
01.07.2025 Germany
01.07.2025 Poland
03.07.2025 Czech Republic
04.07.2025 Norway
10.07.2025 Germany
15.07.2025 Spain
22.07.2025 France
28.07.2025 Austria
28.07.2025 Brazil
29.07.2025 Czech Republic
29.07.2025 Germany
31.07.2025 France
11.08.2025 Switzerland
14.08.2025 Switzerland
19.08.2025 Spain
01.09.2025 Brazil
01.09.2025 Switzerland
15.09.2025 Sweden