Three Sandvik MT720 roadheaders will be used to excavate the 2.5 km-long tunnel on Ottawa’s 12.5 km-long Confederation Line. All three machines are plc controlled and equipped with a guidance system that ensures overbreak stays within a 5 cm tolerance. Read the press release and visit www.sandvik.com. 45/13.
30.10.2025 France
30.10.2025 Romania
03.11.2025 Romania
04.11.2025 Slovakia
04.11.2025 Germany
05.11.2025 Germany
06.11.2025 Belgium
06.11.2025 Romania
10.11.2025 Bosnia and Herzegovina
11.11.2025 Spain
13.11.2025 Switzerland
13.11.2025 France
17.11.2025 Romania
21.11.2025 Austria
21.11.2025 Switzerland
27.11.2025 Switzerland
27.11.2025 Spain
09.12.2025 Switzerland
09.12.2025 Belgium