Three Sandvik MT720 roadheaders will be used to excavate the 2.5 km-long tunnel on Ottawa’s 12.5 km-long Confederation Line. All three machines are plc controlled and equipped with a guidance system that ensures overbreak stays within a 5 cm tolerance. Read the press release and visit www.sandvik.com. 45/13.
14.01.2026 Netherlands
15.01.2026 Spain
16.01.2026 Germany
20.01.2026 Romania
23.01.2026 Switzerland
23.01.2026 Ireland
26.01.2026 Italy
26.01.2026 Germany
26.01.2026 Romania
29.01.2026 Bosnia and Herzegovina
03.02.2026 Finland
04.02.2026 Germany
06.02.2026 Spain
09.02.2026 Norway