Elsewhere in the city, a 10.2 m-diameter Robbins EPB has excavated 7.7 km of the new metro Line 12 in highly variable ground including watery clays, cobbles and large boulders. The picture shows the machine at breakthrough. Read the press release. 16/12.
11.09.2025 Switzerland
15.09.2025 Sweden
15.09.2025 Italy
22.09.2025 Netherlands
29.09.2025 Germany
03.10.2025 Netherlands
09.10.2025 Germany
09.10.2025 Switzerland