Elsewhere in the city, a 10.2 m-diameter Robbins EPB has excavated 7.7 km of the new metro Line 12 in highly variable ground including watery clays, cobbles and large boulders. The picture shows the machine at breakthrough. Read the press release. 16/12.
04.07.2025 Norway
09.07.2025 Spain
10.07.2025 Germany
15.07.2025 Spain
21.07.2025 Czech Republic
22.07.2025 France
28.07.2025 Austria
28.07.2025 Brazil
29.07.2025 Czech Republic
29.07.2025 Germany
31.07.2025 France
05.08.2025 Poland
11.08.2025 Switzerland
14.08.2025 Switzerland
14.08.2025 Italy
19.08.2025 Spain
01.09.2025 Brazil
01.09.2025 Switzerland
02.09.2025 Spain
15.09.2025 Sweden
15.09.2025 Italy