Elsewhere in the city, a 10.2 m-diameter Robbins EPB has excavated 7.7 km of the new metro Line 12 in highly variable ground including watery clays, cobbles and large boulders. The picture shows the machine at breakthrough. Read the press release. 16/12.
02.06.2025 Spain
04.06.2025 Norway
04.06.2025 Austria
05.06.2025 Iceland
05.06.2025 Italy
09.06.2025 Switzerland
13.06.2025 Austria
13.06.2025 Norway
16.06.2025 Spain
17.06.2025 Italy
17.06.2025 France
19.06.2025 France
19.06.2025 Italy
24.06.2025 Switzerland
27.06.2025 Switzerland
04.07.2025 Norway
28.07.2025 Brazil