Elsewhere in the city, a 10.2 m-diameter Robbins EPB has excavated 7.7 km of the new metro Line 12 in highly variable ground including watery clays, cobbles and large boulders. The picture shows the machine at breakthrough. Read the press release. 16/12.
20.10.2025 Romania
21.10.2025 Slovakia
27.10.2025 Italy
27.10.2025 Romania
30.10.2025 France
30.10.2025 Romania
03.11.2025 Romania
04.11.2025 Germany
04.11.2025 Slovakia
05.11.2025 Germany
06.11.2025 Romania
10.11.2025 Bosnia and Herzegovina
11.11.2025 Spain
13.11.2025 Switzerland
21.11.2025 Switzerland
27.11.2025 Switzerland
09.12.2025 Switzerland