Elsewhere in the city, a 10.2 m-diameter Robbins EPB has excavated 7.7 km of the new metro Line 12 in highly variable ground including watery clays, cobbles and large boulders. The picture shows the machine at breakthrough. Read the press release. 16/12.
20.01.2026 Romania
23.01.2026 Switzerland
23.01.2026 Ireland
26.01.2026 Italy
26.01.2026 Germany
26.01.2026 Romania
29.01.2026 Bosnia and Herzegovina
03.02.2026 Finland
04.02.2026 Germany
06.02.2026 Spain
09.02.2026 Norway