On Oct 15, 2020 08:00 AM in Pacific Time (US and Canada) Robbins are hosting a new webinar called “48 Fault Zones and 26 Bar Pressure: Tunneling Turkey's Gerede Water Tunnel”
Difficult ground doesn't begin to describe the challenges overcome at a recent tunnel in central Turkey. The breakthrough of a 5.5 m diameter Robbins Crossover XRE TBM at the Gerede Water Transmission Tunnel was a feat of modern construction. The 9 km leg was the final section of the 31.6 km long water supply line bored through what is widely considered to be Turkey’s most challenging geology: from 48 fault zones to water pressures up to 26 bar, the ground put the machine and the crew to the test. Join in on the conversation with Robbins Vice President Doug Harding as we find out how the unique TBM design and experienced crew overcame a gamut of challenges. In this complimentary, 45-minute event we will cover these topics and more. Join us for a live Q&A session at the end to get a thorough answer from our expert speaker. For further information and to join the webinar please click here. 38/20.
09.05.2025 Germany
09.05.2025 Poland
09.05.2025 Switzerland
13.05.2025 Germany
14.05.2025 Switzerland
14.05.2025 Poland
16.05.2025 Switzerland
16.05.2025 Italy
22.05.2025 Austria
23.05.2025 Switzerland
26.05.2025 Czech Republic
26.05.2025 Norway
28.05.2025 Italy
02.06.2025 Spain
04.06.2025 Norway
04.06.2025 Austria
05.06.2025 Iceland
09.06.2025 Switzerland
16.06.2025 Spain
17.06.2025 Italy
17.06.2025 France
19.06.2025 France
19.06.2025 Italy
24.06.2025 Switzerland
27.06.2025 Switzerland
28.07.2025 Brazil