On 21.11.2013 a cutterhead turning ceremony and champagne celebration marked the return of TBMs to Norway. The 7.2 m-diameter Robbins main beam machine, dubbed “Iron-Erna” after the country’s prime minister, Erna Solberg, will bore sections of the Rossaga hydroelectric project including a 450 m-long access tunnel and 7.40 km-long headrace tunnel through hard rock. The contract was awarded to Norwegian contractor Leonhard Nilsen & Soenner (LNS). Read the press release. Visit www.robbinstbm.com. 02/14.
01.07.2025 Germany
01.07.2025 Poland
03.07.2025 Czech Republic
04.07.2025 Norway
10.07.2025 Germany
15.07.2025 Spain
22.07.2025 France
28.07.2025 Austria
28.07.2025 Brazil
29.07.2025 Czech Republic
29.07.2025 Germany
31.07.2025 France
11.08.2025 Switzerland
14.08.2025 Switzerland
19.08.2025 Spain
01.09.2025 Brazil
01.09.2025 Switzerland
15.09.2025 Sweden