On 21.11.2013 a cutterhead turning ceremony and champagne celebration marked the return of TBMs to Norway. The 7.2 m-diameter Robbins main beam machine, dubbed “Iron-Erna” after the country’s prime minister, Erna Solberg, will bore sections of the Rossaga hydroelectric project including a 450 m-long access tunnel and 7.40 km-long headrace tunnel through hard rock. The contract was awarded to Norwegian contractor Leonhard Nilsen & Soenner (LNS). Read the press release. Visit www.robbinstbm.com. 02/14.
19.09.2025 Norway
22.09.2025 Netherlands
26.09.2025 Poland
29.09.2025 Germany
03.10.2025 Netherlands
06.10.2025 Spain
07.10.2025 Germany
09.10.2025 Germany
09.10.2025 Switzerland
10.10.2025 Spain
10.10.2025 Norway
13.10.2025 Switzerland
15.10.2025 France
10.11.2025 Bosnia and Herzegovina