On 21.11.2013 a cutterhead turning ceremony and champagne celebration marked the return of TBMs to Norway. The 7.2 m-diameter Robbins main beam machine, dubbed “Iron-Erna” after the country’s prime minister, Erna Solberg, will bore sections of the Rossaga hydroelectric project including a 450 m-long access tunnel and 7.40 km-long headrace tunnel through hard rock. The contract was awarded to Norwegian contractor Leonhard Nilsen & Soenner (LNS). Read the press release. Visit www.robbinstbm.com. 02/14.
07.02.2025 France
07.02.2025 Italy
07.02.2025 Poland
07.02.2025 Spain
10.02.2025 Switzerland
17.02.2025 Czech Republic
17.02.2025 Romania
20.02.2025 Germany
27.02.2025 Romania
06.03.2025 Germany
06.03.2025 Norway
11.03.2025 Italy
13.03.2025 Switzerland
01.04.2025 Poland
16.05.2025 Switzerland